WSHN-XEE2 10.2-120.2
37
8 Maintenance
8.1 General description
Maintenance must be done by authorized centres or by qualified personne .
The maintenance allows to:
•
maintain the unit efficie y
•
increase the life span of the equipment
•
assemble information and data to understand the state of the unit efficie y and avoid possible damages
Before checking, please verify the following:
•
the electrical power supply line should be isolated at the beginning
•
the unit isolator is open, locked and equipped with the suitable warning
•
make sure no tension is present
After turning off the p wer, wait at least 5 minutes before accessing to the electrical panel or any other electrical component.
Before accessing check with a multimeter that there are no residual stresses.
8.2 Inspections frequency
Perform an inspection every 6 months minimum.
The frequency, however, depends on the use.
In the event of frequent use it is recommended to plan inspections at shorter intervals:
•
frequent use (continuous or very intermittent use, near the operating limits, etc)
•
critical use (service necessary)
√
intervention frequency (months)
1
6
12
1
presence corrosion
X
2
panel fixin
X
3
water fil er cleaning
X
4
water: quality, ph, weight of glycol (%)
X
5
check the exchanger efficie y
X
6
circulating pumps
X
7
check of the fixing and the insul tion of the power lead
X
8
check of the earthing cable
X
9
electric panel cleaning
X
10
capacity contactor status
X
11
termina closing, cable insulation integrity
X
12
voltage and phase unbalancing (no load and on-load)
X
13
absorptions of the single electrical loads
X
14
test of the compressor crankcase heaters
X
15
Checking for leaks
*
16
survey of the refrigerant circuit operating parameters
X
17
safety valve
*
18
protective device test: pressure switches, thermostats, fl w switches etc..
X
19
control system test: setpoint, climatic compensations, capacity stepping, water / air fl w-rate variations
X
20
control device test: alarm signalling, thermometers, probes, pressure gauges etc..
X
* Refer to the local regulations; and ensure correct adherance. Companies and technicians tha
t eff
ect interventions of installation, maintenance/re-
pairs, leak control and recovery must be CERTIFIED as expected by the local regulations. The leak contr
ol must be eff
ected with annual renewal.
Содержание WSHN-XEE2 10.2
Страница 7: ...WSHN XEE2 10 2 120 2 7 2 3 Instructions for disassembly Only with options MOBMAG...
Страница 14: ...14 WSHN XEE2 10 2 120 2 5 5 Connections performer by customer dwg n WD8U02400...
Страница 43: ...WSHN XEE2 10 2 120 2 43 9 3 Source side 3 way modulating valve...
Страница 44: ...44 WSHN XEE2 10 2 120 2 9 4 Source side 2 way modulating valve...
Страница 45: ...WSHN XEE2 10 2 120 2 45 9 5 VALVE FOR DOMESTIC HOT WATER...