
CS 3-Phase Installation Manual
Page 12
Figure 2. CS 3-Phase Installation Template
MOUNTING PROCEDURES
1. Locate the wall mounting position of the EVSE:
•
Position the bottom of the EVSE enclosure 38” above the
ground.
•
The mounting holes are spaced 16” apart to accommodate
common wall studs.
• If there is no solid structural framing on those centers, provide
an adequate alternative mounting surface for the EVSE.