CHECKING AND STARTING UP THE UNIT

PREPARING FOR FIRST START UP

The chiller must be started up for the first time by the

Technical Assistance Service. Before starting up the chillers,

make sure that:

- All safety conditions have been respected;

- The chiller is adequately fixed to the surface it rests on;

- Functional distances have been respected;

- Hydraulic connections have been carried out as indicated

in the instruction manual;

- The hydraulic circuit is filled and vented;

- The hydraulic circuit cocks are open;

- Electrical connections have been carried out correctly

- Voltage is within a tolerance of 10% of the rated voltage

for the unit;

- The unit is correctly earthed;

- All electrical connections are tight and all hydraulic con-

nections have been carried out correctly.

The unit must be started up for the first time with

standard settings. Set point values may be modified

only after testing has been completed. Before start-

ing up, power up the unit for at least two hours by

positioning QF1 and QS1 to ON and setting the

control panel “HSW3” to OFF to allow the oil in

the compressor sump to heat up.

STARTING UP FOR THE FIRST TIME (after two hours)

Before activating the chiller:

- Make sure the general switch QF1 is in the OFF position

- Make sure the secondary remote switch SA1 (if present)

is in the OFF position

- Make sure the remote keyboard “A6” (if present) is set to OFF

- Remove the inspection panel

- Open the door of the electrical panel, turning QS1 to OFF

- Place the compressor thermal overload switch QM1 in

the ON position

- Close the electrical panel and tighten the closing screws

- Position the main unit switch QS1 in the ON position

- Replace the inspection panel

- Position the general installation switch QF1 (outside the

unit) in the ON position

- The “POWER” LED on the “HSW3” control panel lights

up to indicate the presence of voltage.

OFF

ON

ON

OFF

OFF

ON

A

Содержание HRAN 0011

Страница 1: ...3 Description of standard unit 4 Dimensioned drawings 5 Installation 6 Hydraulic connections 6 Electrical connections 8 General technical data 17 Cooling performance HRAT HRAT E 19 Cooling performance...

Страница 2: ...use of electricity and water a number of fundamental safety rules must be observed namely The unit must not be used by children or by unfit persons without suitable supervision Do not touch the unit w...

Страница 3: ...te spacing the forks as wide apart as possible If a crane is used pass the cables through the bottom of the bed plate making sure they do not exert pressure on the unit Once the packaging has been rem...

Страница 4: ...ressure transducer for contin uous regulation of fan rotation speed REFRIGERANT CIRCUIT The refrigerant circuit includes the following components filter fluid passage indicator thermostatic expansion...

Страница 5: ...77 Dimension 0011 0021 0025 0031 0041 0051 0061 0071 0091 0101 0121 0151 Functional distances 0011 0021 0025 0031 0041 0051 0061 0071 0091 0101 0121 0151 L 900 900 900 900 900 900 900 900 900 900 900...

Страница 6: ...tie rods if necessary If a heat pump unit is being installed fit a condensate col lection pan available as accessory The choice and installation of components is the responsi bility of the installer w...

Страница 7: ...and 2 bars It is recommended that this operation be repeat ed after the unit has been operating for a number of hours The pressure of the installation should be checked regularly and if it drops below...

Страница 8: ...ckable An efficient earth connection is obligatory Failure to earth the appliance absolves the manufac turer of all liability for damage In the case of three phase units ensure the phases are connecte...

Страница 9: ...16 0 73 2 13 4 45 2 66 5 53 1A 1A 1A 1A 6 3A 0025 400 3N 50 2 25 4 09 38 5 0 16 0 73 2 41 4 82 3 13 6 43 1A 1A 1A 1 6A 6 3A 0031 400 3N 50 2 6 4 6 43 5 0 32 1 46 2 92 6 06 3 76 8 08 1A 1A 2A 1 6A 6 3...

Страница 10: ...on fuse FU4 Water pump protection fuse KA1 High pressure switch relay KA2 Water pump control relay QM1 Compressor thermal overload switch KM1 Compressor contactor ELECTRICAL PANEL LAYOUT HRAT HRAN 001...

Страница 11: ...een terminals 10 and 11 Connect the phase to termi nal 11 and the alarm warning device between terminal 10 and neutral max load 500mA at 24V It is prohibited to earth the secondary of the 24V transfor...

Страница 12: ...Z1 1 C1 QM1 QS1 U N 45 46 47 WIRING DIAGRAM 0011 0021 SINGLE PHASE Factory installed components A1 Radio interference suppresser A2 Electronic controller A6 Unit control display keyboard BP3 Condensin...

Страница 13: ...L N 1 1 M 2 3 C S R KM1 Z1 1 C1 QM1 QS1 U N 45 46 47 WIRING DIAGRAM 0025 0031 SINGLE PHASE Factory installed components A1 Radio interference suppresser A2 Electronic controller A6 Unit control displ...

Страница 14: ...X 42 41 FU3 2 2 3 4 0 3 3 0 2 45 46 47 WIRING DIAGRAM 0011 0021THREE PHASE Factory installed components A1 Radio interference suppresser A2 Electronic controller A6 Unit control display keyboard BP3 C...

Страница 15: ...RMINAL BOX 42 41 FU3 C3 2 2 3 5 0 3 3 4 0 3 3 0 2 45 46 47 WIRING DIAGRAM 0025 0061THREE PHASE Factory installed components A1 Radio interference suppresser A2 Electronic controller A6 Unit control di...

Страница 16: ...0 38 41 42 45 46 47 30 31 33 15 43 30 42 20 0 MORSETTI PER INSTALLATORE INSTALLATOR TERMINAL BOX 17 42 41 WIRING DIAGRAM 00271 0151THREE PHASE Factory installed components A Radio interference suppres...

Страница 17: ...city 1 kW 4 7 6 1 7 0 8 2 10 5 12 5 15 0 19 1 22 2 26 8 32 4 38 8 Compressor power input 1 kW 1 65 2 11 2 5 2 94 3 43 4 21 4 88 6 31 7 77 8 93 10 93 13 4 Total power input 1 kW 1 81 2 27 2 66 3 26 3 7...

Страница 18: ...Scroll Scroll Scroll Scroll Scroll Scroll Scroll Scroll Scroll Scroll Number of compressors N 1 1 1 1 1 1 1 1 1 1 1 Number of circuits N 1 1 1 1 1 1 1 1 1 1 1 Power steps N 1 1 1 1 1 1 1 1 1 1 1 Hydr...

Страница 19: ...1 1 1 1 1 1 1 2 1 2 1 2 Pev 27 7 29 4 31 1 32 9 34 8 36 7 Pf 6 0 6 2 6 3 6 5 6 7 6 9 Pa 2 7 2 7 2 8 2 8 2 8 2 8 43 Pat 2 9 2 9 2 9 2 9 3 0 3 0 Qev 1 0 1 1 1 1 1 1 1 2 1 2 Pev 25 6 27 2 28 9 30 6 32 3...

Страница 20: ...0 9 1 9 2 9 2 Qev 3 4 3 5 3 6 3 7 3 8 3 9 Pev 18 6 19 7 20 9 22 2 23 4 24 8 Pf 19 1 19 6 20 2 20 8 21 4 22 0 Pa 8 8 8 9 8 9 9 0 9 1 9 1 43 Pat 9 5 9 5 9 6 9 7 9 7 9 8 Qev 3 3 3 4 3 5 3 6 3 7 3 8 Pev...

Страница 21: ...6 1 7 1 7 1 8 1 8 1 9 Pev 18 4 19 5 20 7 22 0 23 2 24 6 Pf 8 8 9 1 9 4 9 7 9 9 10 2 Pa 3 5 3 5 3 5 3 6 3 6 3 6 40 Pat 3 8 3 8 3 9 3 9 3 9 4 0 Qev 1 5 1 6 1 6 1 7 1 7 1 8 Pev 16 2 17 2 18 3 19 4 20 5 2...

Страница 22: ...4 2 5 2 6 2 7 2 7 2 8 Pev 22 9 24 3 25 7 27 0 28 4 29 8 Pf 13 9 14 3 14 7 15 1 15 5 15 8 Pa 4 6 4 7 4 7 4 8 4 8 4 8 32 Pat 5 0 5 0 5 0 5 1 5 1 5 1 Qev 2 4 2 5 2 5 2 6 2 7 2 7 Pev 22 0 23 3 24 7 26 0 2...

Страница 23: ...input kW Pc evaporator pressure drop kPa Tw evaporator water outlet temperature C Pat total power input kW Pt Heating capacity kW Qc condenser water flow m3 h conditions out of the operating limits U...

Страница 24: ...Pat 4 4 4 8 5 3 5 9 Qc 3 1 3 1 3 1 3 1 Pc 36 5 36 3 36 1 35 9 Pt 20 2 20 0 19 8 19 7 Pa 4 2 4 6 5 1 5 7 15 Pat 4 5 4 9 5 4 6 0 Qc 3 5 3 5 3 5 3 4 Pc 47 0 46 4 45 8 45 1 Pt 15 5 15 6 15 7 Pa 4 8 5 4 6...

Страница 25: ...7 34 0031 55 46 40 37 34 0041 58 49 43 40 37 0051 58 49 43 40 37 0061 58 49 43 40 37 0071 65 56 50 47 44 0091 65 56 50 47 44 0101 65 57 52 49 46 0121 65 57 52 49 46 0151 65 57 52 49 46 Octave band Hz...

Страница 26: ...pump HPA75H1 5 Storage tank pump HPA150H1 Model Water flow m3 h 0 6 0 8 1 00 1 2 1 4 1 6 1 8 l sec 0 167 0 222 0 278 0 333 0 389 0 444 0 500 Model Water flow m3 h 1 4 1 8 2 2 2 6 3 0 3 4 3 8 4 2 l se...

Страница 27: ...1 plate heat exchanger 2 water differential pressure switch 3 compressor 4 fan 5 finned coil 6 liquid receiver 7 cycle reverse valve 8 thermostatic valve 9 liquid indicator 10 filter 11 check valve 1...

Страница 28: ...ime with standard settings Set point values may be modified only after testing has been completed Before start ing up power up the unit for at least two hours by positioning QF1 and QS1 to ON and sett...

Страница 29: ...Make sure the voltage falls within the limits speci fied and that the unbalance between the three phas es three phase power supply is no more than 3 ACTIVATING AND DEACTIVATINGTHE UNIT Place the remo...

Страница 30: ...seconds The water return temperature is displayed the settings are complete To display the status of the unit the alarms and the operating hours return to the SEt level and then per form the procedur...

Отзывы: