c l i m a t e m a s t e r.c o m
31
TSM/TSL Vertical Stack
R e v. : J a n u a r y 1 8 , 2 0 2 1
T H E S M A R T S O L U T I O N F O R E N E R G Y E F F I C I E N C Y
Drywall Openings, Cont’d.
NOTICE - Drywall openings shown below are for specific
cabinets as indicated. Cut openings for your cabinet,
supply air grille, and thermostat.
Slab
Opening for
“G” Panel
Outside Wall
Insulation
Field Supplied
Insulated
Ductwork
Field Supplied Grille with
Insect Screen
G Panel Frame
Seal 4 Sides
Motorized Air Damper Door
Assembled to Frame.
Connect Molex Wire Harness
to Chassis Control Box.
Cut Hole
in Stud
and Seal.
See IOM
with Kit for
Location
and Size.
15' Whip
Drywall
Note 2
1” Min
5½ Max
62½”
A
Slab
Fig 2D:
H Panel
Drywall Opening
(with frame)
09-12
15-18
24-36
A
17”
20”
24”
B
16”
19”
23”
6”
57½”
B
Slab
Fig 2E:
G Panel
Drywall Opening
(with frame)
(Notes 1 and 3)
(1461)
57½”
24
½
”
(622)
5
7⁄8
”
(622)
24.25”
(616)
One or two layers
of drywall. Set
studs accordingly.
Finished Wall
Cabinet
Supply Air
Ductwork
(Customer Supplied)
Canvas Type
Flex Boot
(Customer
Supplied)
(1650)
65”
Drywall Openings
for 65” Cabinets and
G Return Air Panel
Cabinet
Figure 10
Notes:
1.
Optional factory-installed whips (Model Digit 13) end with 9 pin molex connector.
2.
Field-supplied 2x4 Box must be a type that the side can be removed so molex can be put inside. Position box
horizontal or vertical for thermostat.
3.
Optional 15, 25, or 35 foot whips (thermostat cable Class 2) available. Whips in BX armor available as special.
4. 1” to 12”(25 to 305) stands available, stands are bulk shipped and must be field installed.
5. When stands or ISO pads are used, make sure riser length and position is calculated correctly. 3” above and
tailpiece always from bottom of cabinet. Stand or ISO pads raises everything up.
6.
For 2” filter, set cabinet 2” (50) minimum from front of drywall.