![Cleveland MKET-12-T Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/cleveland/mket-12-t/mket-12-t_operators-manual_2623080009.webp)
MARINE LOCK
Use a small nylon bristle brush to remove food
and debris from pivot point. If lock is still sticking
have maintenance disassemble and clean pieces
individually and reassemble.
Disassembly
1.
Disconnect power from kettle.
2.
Remove console cover from top of kettle's
console.
3.
Remove locknut and lockwasher from inside
console.
4.
Remove shoulder bold from latch.
5.
Clean all parts.
Re-Assembly
6.
Apply locktight to shoulderbolt where
illustrated. Replace shoulder bolt and latch
and tighten firmly.
7.
Replace lockwasher and locknut inside the
console and tighten firmly.
8.
Test Marine Lock. See Marine Lock Testing
Procedure.
9.
Replace console cover.
Latch
Shoulder Bolt
Lockwasher
Locknut
Carefully apply
locktight to the
final two threads.
AGITATOR ASSEMBLY
1.
Place the Kettle’s On-Off Toggle Switch (
1
) to
the "OFF' position.
2.
Raise Mixer Bridge (
11
).
3.
Push Main Agitator Arm towards Bayonet
Mount (
15
), rotate counterclockwise and then
pull out to remove. Repeat process for
Secondary Agitator Arm (
14
).
4.
Scraper blades can be removed by sliding
them up the arm and rotating until free.
5.
Clean all parts.