ELECTRICAL
ENSURE THE ELECTRICAL SUPPLY MATCHES
THE KETTLE'S REQUIREMENTS AS STATED
ON THE RATING LABEL.
This kettle is built to comply with applicable
standards of manufacturers. Included among
these approval agencies are UL, NSF, ASME/Ntl.
Bd., CSA, ETL, and others. Many local codes
exist, and it is the responsibility of the owner and
installer to comply with these codes.
The electrical supply must match the power
requirements specified on the kettle’s rating plate.
The copper wiring must be adequate to carry the
required current at the rated voltage. Refer to the
Specification Sheet for all electrical specifications.
Note:
Maximum voltage for LVD (low volt
directive for Europe) to be 440 volts for CE
marked appliances.
POTABLE WATER
The water faucet (optional) with swing spout,
requires 1/2 inch O.D. copper tube plumbing for
hot or cold water supplies to the faucet (SPK -
cold water connection only, DPK - hot and cold
water connection).
INSTALLATION CHECKS
Although the kettle has been thoroughly tested
before leaving the factory, the installer is responsible
for ensuring the proper operation of kettle once
installed.
Final Installation Check
1.
Partially fill the kettle with water.
2.
Slowly turn the steam control valve's knob to
the open position.
3.
Release the safety valve, ensuring that the
steam escapes freely. Stay clear of steam
exhaust when releasing the safety valve.
4.
Observe that the water in the kettle comes to
a boil.
5.
Close the steam supply valve.
6.
Drain off the water by tilting the kettle.
CLEANING
After installation the kettle must be thoroughly
cleaned and sanitized prior to cooking. See
complete cleaning instructions in this manual.
Содержание MKDT-12-T
Страница 14: ...BRIDGE ASSEMBLY ...
Страница 16: ...GEAR BOX NOTE Insert bolts in opposite holes for taper lock bushing removal A ...
Страница 20: ...WIRING DIAGRAM ...