Disassembly
1.
Disconnect power from kettle.
2.
Remove console cover from top of kettle's
console.
3.
Remove locknut and lockwasher from inside
console.
4.
Remove shoulder bold from latch.
5.
Clean all parts.
Re-Assembly
6.
Apply locktight to
shoulderbolt where
illustrated. Replace
shoulder bolt and latch
and tighten firmly.
7.
Replace lockwasher and locknut inside the
console and tighten firmly.
8.
Test Marine Lock. See Marine Lock Testing
Procedure.
9.
Replace console cover.
MARINE LOCK
Use a small nylon bristle brush to remove food
and debris from pivot point. If lock is still sticking
have maintenance disassemble and clean pieces
individually and reassemble.
Latch
Shoulder Bolt
Carefully apply
locktight to the
final two threads.
Lockwasher
Locknut
MARINE LOCK TESTING
PROCEDURE
1.
Check that lock clears stop pin on side box
without rubbing when kettle is tilted (Figure
A
).
2.
Check side to side play. Lock should remain
fully over stop pin when pushed to it's
maximum side to side play (Figure
B
).
3.
Check that the kettle when pushed fully
upright moves the lock to a closed position.
To check this:
A/
Hold the latch firmly in the unlocked
position while tilting the kettle back to an
upright position.
B/
The kettle sidebox will force the lock into a
new position.
C/
Hold the lock in this position and try to tilt
the kettle forward. The latch should prevent
the kettle from tilting.
Side Box
Lockwasher
Locknut
Shoulder Bolt
Console
Figure
B
(Top View)
Side to Side Play
Stop Pin on
Sidebox
Marine Lock
(Latch)
Figure
A
(Side View)
4.
Check shoulder bolt is firmly seated against
console body.
5.
Check on inside of console box that shoulder
bolt locknut is secure.
Содержание KET-12-T
Страница 14: ...CONSOLE COMPONENTS MARINE LOCK 6 4 6 7 10 9 8 11 13 25 23 5 2 3 1 14 15 16 18 19 20 21 17 24 22 ...
Страница 18: ......
Страница 31: ...WIRING DIAGRAM 3 Gallon Kettles 200 240v Single Phase Only 380 480v Single Phase Only ...
Страница 32: ...WIRING DIAGRAM 6 20 Gallon 200 240v 380 600v ...