The electrical connection may only be carried out by a qualified electrician. For
the electrical installation the current applicable VDE, country specific and EU
regulations must be observed.
All installation and test activities must be carried out by a qualified electrician and according to
the latest standards. Electrical outlets must be equiped with a breaker. The electricity network
(230 VAC 50Hz or 400 VAC 50 Hz) to which components are connected must be equipped
with a 30 mA fault current protector (earth leakage breaker), as stated in the DIN EN 60335-2-
41 / VDE 0700 standard. If the electrical connection cable is damaged, it must be replaced.
Turn off the power before you start working.
Local regulations must be observed. The steam generator must be installed in an area intended
for this purpose. This area must be equipped with adequate ventilation. During installation, a
multi-pole main switch must be installed with a contact distance of at least 3 mm.
The steam bath generator belongs to “Protection class I” (electrical divices) and must be
connected via an earth leakage breaker. The steam generator must be connected correct in
the same way as all Class I devices. Components that have a higher voltage than 12V must be
installed out of reach of people for safety reasons. The electricity scheme is
attached. All connections must be done according to this scheme, respecting all regional and
national regulations. The work may only be carried out by a qualified electrician.
In the electrical scheme the maximum connection value
of the external components is shown. These values may not
be exceeded. No modification may be made to the
original wiring. External components may only be
connected to the appropriate clamps.
Connect all cables in accordance with NEN 1010.
10 Electrical connection
Circuit breaker
(Not included in delivery)
Electricity supply 230 / 400 V
Содержание Cleo Steam Smart 90187003
Страница 10: ...10 5 6 7 8 9 8 Vervolg montage op de wand m8 8mm...
Страница 32: ...32 21 Terug plaatsen deksel en kap 1 2...
Страница 34: ...34 Installation manual...
Страница 43: ...43 5 6 7 8 9 8 Next steps mounting on the wall m8 8mm...
Страница 65: ...65 21 Placing back cover and lid 1 2...
Страница 67: ...67...