45
5.6.3
Inspecting the electrical installation
Check the following points:
Do the supply voltages for heating and control comply with the relevant
voltages given in the wiring diagram?
Is the correct CF Card inserted?
Are the voltage supplies (heating and control voltage) correctly fused?
Are the service switches “Q..” installed in the supply lines for to the
heating and control voltage?
Are all components correctly connected according to the wiring dia
gram?
Are all connecting cables fastened?
Are the connecting cables free of tension (passed through cable
glands?)
Does the electric installation meet the applicable local regulations for
electric installations?
Is the unit reassembled correctly and the front panel of the control
compartment fixed with the screw?
Internal control voltage supply via option CVI
– Option
CVI
(mains supply
with neutral lead
):
For mains voltages of 400 V/3~/50...60 Hz, 400 V/2~/50...60 Hz and
230 V/3~/50...60 Hz. The option CVI is connected according to the fol
lowing wiring diagram.
PE
PE
SC2
SC1
N
L1
X1
F1
6.3 AT
SWITCH
L1FU
N
L1SW
NSW
X2
MAIN SUPPLY
MODULE B
PE
P1
N
P
X6
Cleo Premium Pro
ext.
Q5
K1
XE1
F5
L1 L2 L3
L1 L2 L3
400 V/3~/50..60 Hz
230 V/3~/50..60 Hz
N PE
PE
N
Q5
F5
L1 L2
400 V/2~/50..60 Hz
L1 L1 L2 L3 N PE
F7
6.3 AT
Содержание Cleo Premium Pro 1532
Страница 1: ...MOUNTING INSTRUCTIONS Cleo Premium Pro Professional steam generator 90549003 EN ...
Страница 2: ......
Страница 50: ...Notes ...
Страница 51: ... Cleopatra B V ºTechnical modifications reserved ...