PV-ezRack SolarTripod (double and single) Installation guide V2
Page 12 of 15
11/20 Duerdin St
Tel: +61 3 9017 6688
Clayton VIC 3168, Australia
Fax: +61 3 9017 6668
www.clenergy.com.au
Email: [email protected]
5.1.2 Unfold the middle
tubes in the upper support
(if you use double Tripod),
fix them to the base
support by using hex head
bolts M10*65 and Spring
Washer, Flat Washer and
Hex nuts M10.
5.1.3 Repeat the step
above for each support
that you need to install.
Fix the support Tripod to
the purlin following the
planning guide.
5.2 If installing Adjustable Tripod
5.2.1Fix two freeness al-
tubes together by using
hex head bolts M10*65,
Spring Washer, Flat
Washer and Hex nuts M10