background image

 

 

PV-ezRack Solar Terrace III_Planing and Installation Guide_V1.2 (Rev 1) 

Page 10 of 11

 

 

18/20 Duerdin St 

 

 

Tel: +61 3 9017 6688 

Clayton VIC 3168, Australia    

 

 

Fax: +61 3 9017 6668 

www.clenergy.com.au 

 

Email: [email protected] 

3.3 Installating PV panels 

3.3.1 Install the panels by 
using patented Clenergy 

End Clamps and Inter 

Clamps. Clenergy 
recommends 750-1000mm 

rail overhang at the end of 

the array. It can be 
maximum 50% of the 

spacing between the STIII 

supports.  

         

 

3.3.2 Install the second row 

of panels making sure to 
leave an 18mm gap 

between the two rows.   

 

3.3.3 Now the installation is 
completed. 

 

 
 

Содержание PV-ezRack SolarTerrace III

Страница 1: ...61 3 9017 6668 www clenergy com au Email sales clenergy com au PV ezRack SolarTerrace III Planning and Installation Guide Complying with AS NZS1170 2 2011 Contents 1 Introduction 2 2 Installation Too...

Страница 2: ...allation and especially when working on the roof inform yourself about the appropriate safety regulations and please also pay attention to the relevant regulations of your local region Please check th...

Страница 3: ...sales clenergy com au Power Tool Adjustable Spanner String 2 2 Component List Overview of system components End Clamp Inter Clamp T Rail Rail Clamp Splice for T Rail Assembly Support 2 3 System Compon...

Страница 4: ...Fax 61 3 9017 6668 www clenergy com au Email sales clenergy com au 2 4 Installation Planning Clenergy PV ezRack SolarTerrace III is compatible for panels up to 1800mm long Design for panels 1800mm lon...

Страница 5: ...gion A Region B Region C Region D Wind Speed m s 41 48 56 66 Leg Spacing m 3100 2800 2200 1500 Footing design We recommend using M10 Grade 5 8 Carbon Steel anchor studs with Ramset Chemset REO502 chem...

Страница 6: ...18 20 Duerdin St Tel 61 3 9017 6688 Clayton VIC 3168 Australia Fax 61 3 9017 6668 www clenergy com au Email sales clenergy com au...

Страница 7: ...e single Truss Support 3 1 1 Unfold the folded Truss support then Bolt the enforcement tube to the bottom of the back leg Fasten the bolts and nuts pre assembled to secure the structure 3 1 2 Connect...

Страница 8: ...the all Tri Groove Beam must be in the same line 3 2 Installing the T Rails 3 2 1 Before installing the T Rails mark the position of the rails on the beam Note Clenergy will preassemble the bottom ra...

Страница 9: ...8 Clayton VIC 3168 Australia Fax 61 3 9017 6668 www clenergy com au Email sales clenergy com au 3 2 3 Install the rails according to 3 2 1 3 2 3 Mark the panel array perimeter and attach T Rail to Tri...

Страница 10: ...ales clenergy com au 3 3 Installating PV panels 3 3 1 Install the panels by using patented Clenergy End Clamps and Inter Clamps Clenergy recommends 750 1000mm rail overhang at the end of the array It...

Страница 11: ...Finished Aluminium www aamanet org are not followed by Purchaser This Warranty does not cover damage to the Product that occurs during its shipment storage or installation This Warranty shall be VOID...

Отзывы: