background image

 

 

18/20 Duerdin St                     

   

                                Tel: +61 3 9017 6688 

Clayton VIC 3168, Australia    

 

                               Fax: +61 3 9017 6668 

www.clenergy.com.au 

 

                                   Email: [email protected] 

 

 

Clenergy  PV-ezRack

®

  SolarTerrace  III™  is  a  pre-assembled  ground  mount 

system  suitable  for  large  scale  commercial  and  utility  scale  installations.  PV-
ezRack  SolarTerrace  III  has  been  developed  to  fit  any  PV  module.  The 
innovative  and  patented  SolarTerrace  III™  T-Rails  simplify  and  improve  the 
accuracy  of  the  installation.  Using  high  quality  engineered  components 
SolarTerrace  III

®

™  saves  developers  and  installers,  time  and  money  when 

delivering large scale projects. 
 
Please  review  this  manual  thoroughly  before  installing  your  SolarTerrace  III™ 
system.  This manual provides (1) supporting documentation for building permit 
applications  relating  to  PV-ezRack  SolarTerrace  III  Mounting  system,  and  (2) 
planning and installation instructions for SolarTerrace III. 
 
SolarTerrace  III™  parts,  when  installed  in  accordance  with  this  guide,  will  be 
structurally  adequate  and  will  meet  the  AS/NZS  1170  standards.  During  the 
installation  and  especially  when  working  on  the  roof  inform  yourself  about  the 
appropriate  safety  regulations,  and  please  also  pay  attention  to  the  relevant 
regulations  of  your  local  region.    Please  check  that  you  are  using  the  current 
version of the installation manual by contacting Clenergy Australia by email on 
[email protected], or your local representative. 

 
The installer is solely responsible for: 

 

Complying  with  all  applicable  local  or  national  building  codes,  including 
any that may supersede this manual; 

 

Ensuring  that  PV-ezRack  and  other  products  are  appropriate  for  the 
particular installation and the installation environment; 

 

Using  only  PV-ezRack  parts  and  installer-supplied  parts  as  specified  by 
PV-ezRack (substitution of parts may void the warranty and invalidate the 
letter of certification on page 2); 

 

How to recycle: according to the local relative statute. 

 

How to disassemble: Reverse installation process.   

 

Ensure that there are no less than two professionals working on panel 
installation.   

 

Ensure the installation of relative electrical equipment is performed by 
professional electrician.  

 

Ensuring safe installation of all electrical aspects of the PV array. 

2.

 

Installation Tools & Components 

2.1 Installation Tools 

 

Allen Key  

Содержание PV-ezRack SolarTerrace III

Страница 1: ...61 3 9017 6668 www clenergy com au Email sales clenergy com au PV ezRack SolarTerrace III Planning and Installation Guide Complying with AS NZS1170 2 2011 Contents 1 Introduction 2 2 Installation Too...

Страница 2: ...allation and especially when working on the roof inform yourself about the appropriate safety regulations and please also pay attention to the relevant regulations of your local region Please check th...

Страница 3: ...sales clenergy com au Power Tool Adjustable Spanner String 2 2 Component List Overview of system components End Clamp Inter Clamp T Rail Rail Clamp Splice for T Rail Assembly Support 2 3 System Compon...

Страница 4: ...Fax 61 3 9017 6668 www clenergy com au Email sales clenergy com au 2 4 Installation Planning Clenergy PV ezRack SolarTerrace III is compatible for panels up to 1800mm long Design for panels 1800mm lon...

Страница 5: ...gion A Region B Region C Region D Wind Speed m s 41 48 56 66 Leg Spacing m 3100 2800 2200 1500 Footing design We recommend using M10 Grade 5 8 Carbon Steel anchor studs with Ramset Chemset REO502 chem...

Страница 6: ...18 20 Duerdin St Tel 61 3 9017 6688 Clayton VIC 3168 Australia Fax 61 3 9017 6668 www clenergy com au Email sales clenergy com au...

Страница 7: ...e single Truss Support 3 1 1 Unfold the folded Truss support then Bolt the enforcement tube to the bottom of the back leg Fasten the bolts and nuts pre assembled to secure the structure 3 1 2 Connect...

Страница 8: ...the all Tri Groove Beam must be in the same line 3 2 Installing the T Rails 3 2 1 Before installing the T Rails mark the position of the rails on the beam Note Clenergy will preassemble the bottom ra...

Страница 9: ...8 Clayton VIC 3168 Australia Fax 61 3 9017 6668 www clenergy com au Email sales clenergy com au 3 2 3 Install the rails according to 3 2 1 3 2 3 Mark the panel array perimeter and attach T Rail to Tri...

Страница 10: ...ales clenergy com au 3 3 Installating PV panels 3 3 1 Install the panels by using patented Clenergy End Clamps and Inter Clamps Clenergy recommends 750 1000mm rail overhang at the end of the array It...

Страница 11: ...Finished Aluminium www aamanet org are not followed by Purchaser This Warranty does not cover damage to the Product that occurs during its shipment storage or installation This Warranty shall be VOID...

Отзывы: