6
/ 9
No. 999-1009, Min’an Avenue, Xiang’an 18/20 Duerdin ,
Xiamen China 361006 Clayton VIC 3168
Tel: +86-592-5781288 Tel: +61-3-90176688
Fax: +86-592-5782298 Fax: +61-3-90176668
Email:
Email:
Website:
www.clenergy.com.cn
Website: www.clenergy.com.au
vary from those shown in this guide. The installation process detailed in this instruction
guide remains the same regardless of the component size. In case you need to do any
on-site modifications or alteration of the system in a way that would be different from
the construction drawing please
provide marked up drawings/sketches for Clenergy’s
review prior to modification for comment and approval.
4. Installation Instruction
4.1 Install MT-Rail
4.1.1 Place MT-Rail along
both length and width
direction according to your
planning as shown in Figure
1.
4.1.2 Use Rail Cross
Connector to connect MT-
Rails and fasten with Bolts
M10*45 tightly as shown in
Figure 2 and 3.
Recommended torque for
Bolts M10*45 is 24-26N·m.
Figure 1
Figure 2 Figure 3
4.2 Install Clamp Tray
4.2.1 According to your plan,
fix the Clamp Tray on MT-
Rail along length direction
and fasten with Bolts M8*20
tightly, and load specified
ballast blocks on Clamp Tray
as shown in Figure 4 and 5.
Recommended torque for
Bolts M8*20
is
18-20 N·m.
Figure 4 Figure 5