![Clemco PULSAR IX Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/clemco/pulsar-ix/pulsar-ix_manual_2622429010.webp)
PULSAR
®
IX SUCTION BLAST CABINET
Page 9
© 2019 CLEMCO INDUSTRIES CORP.
www.clemcoindustries.com
Manual No. 23425, Rev. C, 07/19
2.7.1
Connect the 6" diameter flex hose between the
cabinet hopper and reclaimer inlet, as shown in Figure 1
2.7.2
Connect the 7" diameter flex hose between the
reclaimer outlet and the dust-collector inlet, as shown in
Figure 2. This hose is sometimes removed for shipping.
2.7.3
Clamp the flex hoses securely in position with
worm clamps provided.
2.8
Connect Media Hose to Metering Valve
2.8.1
Refer to Figure 8 and attach the clear media
hose from under the cabinet hopper to the metering
valve at the bottom of the reclaimer hopper, by pushing
the hose onto the barded fitting.
Figure 8
2.9
Set Inlet Damper ‒ Figure 9
2.9.1
The inlet damper is located on the top of the
cabinet and must be set to match the cabinet dimensions
and reclaimer size. The label on the damper shows the
settings in degrees. For the initial setting on a Pulsar IX,
align the handle to 0 degrees (full open). The air damper
was preset prior to shipment; confirm the initial setting, as
noted below.
Figure 9
2.10
Air Connection to Power Module
2.10.1
Connect the air hose from the piping assembly
under the cabinet to the dust-collector pulse-pressure
regulator on the dust collector. Refer to Figures 2 and 3.
2.11
Final Assembly
2.11.1
Position the foot pedal on the floor at the front of
the cabinet.
2.11.2
A package of five view-window cover lenses is
supplied with the cabinet. Install a cover lens, per
Section 7.3. When the cover lens becomes pitted or
frosted, replace it.
3.0
FIELD INSTALLED ACCESSORIES
3.1
Aluminum Oxide (aggressive media) Kit
3.1.1
An optional aluminum oxide kit is available
factory installed or may be field installed later.
Factory installed Alox kit consists of rubber curtains for
doors, front and walls rear walls, curtain hardware, and
boron carbide nozzle. Refer to Section 3.2 for curtain
installation.
Field-installed (or replacement factory-installed) kits
consist of black rubber cabinet curtains (refer to Section
3.2 for curtain installation), a boron carbide nozzle, and
light-lined flex hose. If existing hose is in good condition,
reserve the new hose for future replacement.
3.2
Cabinet Curtain Installation ‒ Figure 10
3.2.1
Match curtains to corresponding walls and
doors. When overlapping curtains, make sure the
overlaps are on the correct end of the curtains.
3.2.2 Front and rear walls:
Position the curtain on
the wall to be protected. Using the curtains as templates,
mark each mounting point through the grommet holes,
along the upper edge of the curtain. NOTE: When laying
out the attachment points, the upper edges of the
curtains should be aligned with the top of the cabinet,
and the front curtain should be aligned around the view
window. Remove the curtains, and drill a .187" (3/16")
diameter hole at each point marked. Install the curtains
using the fasteners provided (machine screw, flat
washer, lock washer and nut) at each grommet. The flat
washer is used between the screw head and curtain
grommet.
3.2.3
Doors:
Using protectors against the curtains and
outer doors, clamp the door curtains in place. NOTE:
Degrees Label
Air-Inlet Damper
Damper Handle
Align handle to 0 degrees.
Barbed Hose Fitting
Clear Media Hose
Metering Valve