4.5 - Ethernet Switch
An Ethernet switch is required for installations where the PLC Ethernet port is already in use. The
880-10069-000 kit includes the necessary installation hardware:
•
Fuse holder
•
2A fuse
•
End anchors
•
2-pole jumper
•
Ethernet cables
To install:
1. Install Ethernet switch (5-port or 8-port) on the DIN rail.
2. Install 24V fuse holder with 2A fuse next to the gateway fuse.
3. Connect the fuses with the 2-pole jumper. The gateway and Ethernet switch will both use the
12VDC power supply.
4. Wire Terminal 1 of the Ethernet switch to the blue terminal block.
5. Wire Terminal 2 of the Ethernet switch to the 2A fuse.
6. Remove the customer Ethernet connection from the PLC and connect it to any port on the Ether-
net switch.
Using Ethernet cables:
7. Connect the TOP port of the Gateway to any port on the Ethernet switch.
8. Connect the Ethernet switch to the PLC.
5 - Installation Procedure - DT Panel
Subject to the maximum CAT 5E cable length of 328 ft (100 meters), the DT panel can be mounted
in any suitable location with an acceptable cellular signal.
Install the LTE antenna on the panel exterior. The antenna may be mounted on the top or side of the
panel. See steps 1-5 under
LTE Antenna
above.
Make 120VAC main power wiring connections as described above under
Power Supply
. Refer to wir-
ing diagram if necessary.
Continue with
Ethernet Connections
and
Troubleshooting
below.
WARNING
!
Disconnect power and follow all applicable
lockout/tagout procedures before beginning
installation.
Содержание Prometha
Страница 1: ...750 441 01 2020 PromethaTM Connected Boiler Room Solution Installation Manual...
Страница 4: ......
Страница 10: ...Prometha Installation 750 441 6 6 Wiring Diagrams GATEWAY GATEWAY GATEWAY...
Страница 38: ......