Prometha
™
Installation
750-441
1
The Cleaver-Brooks Prometha™ Connected Boiler Solution collects and transmits Hawk and network
data to the C-B cloud to allow customer accessibility via web-based dashboards and optional user
notifications. The specific Hawk network PLCs that are available for this solution are:
•
Hawk ICS (PLC must include Ethernet port)
•
Hawk 1000
•
Hawk 4000
•
Hawk 4000 V2
1 - Hardware Required:
Prometha™ requires the addition of four major components to allow data collection from the PLC and
transmission of that data to the cloud via LTE cellular connection.
•
Cellular Enable Gateway Device
•
Gateway Power Cable
•
12VDC Power Supply
•
Antenna
Optional Hardware:
5- or 8-Port Ethernet Switch (optional based on availability of Ethernet ports)
Miscellaneous:
Cables, fuses, cable ties, and DIN rail components - see Parts List.
2 - Tools Required:
Tape measure
Alcohol wipes
Pencil
Drill
7/8” hole saw
Adjustable pliers
Screwdrivers
Diagonal cutter
Electrical Specifications
Voltage: 120VAC, 50-60 Hz
Amps: 1.1A
Содержание Prometha
Страница 1: ...750 441 01 2020 PromethaTM Connected Boiler Room Solution Installation Manual...
Страница 4: ......
Страница 10: ...Prometha Installation 750 441 6 6 Wiring Diagrams GATEWAY GATEWAY GATEWAY...
Страница 38: ......