Section 2 — Installation
2-22
Part No. 750-263
G. BOILER WATER PIPING
1. General
All boiler hot water outlet and return piping is connected at the rear
of the boiler. Piping is to be installed per local codes and
regulations.The pipelines for the hot water outlet and return may be
connected in the usual manner without removing the cladding
elements. Unused connectors must be safely blanked off.
2. Safety valve
Pressure relief valve (Safety Valve) should be piped from the air vent
piping or hot water outlet pipe (see
Figure 2-24
). Use pipe sealing
compound and a flat sided wrench when securing the Safety relief
valve. Do not use a pipe wrench and do not over tighten the relief
valve. The safety valve must be mounted in a vertical position so
that discharge piping and code-required drains can be properly
piped to prevent buildup of back pressure and accumulation off
oreign material around the valve seat area. Apply only a moderate
a m o u n t o f p i p e c o m p o u n d t o m a l e t h r e a d s a n d a v o i d
overtightening, which can distort the seats. Use only flat-jawed
wrenches on the flats provided.
3. Dual return design
The Model CFC features separate high and low temperature return
water connections, allowing for condensing performance within
high temperature hydronic systems. With as little as 10% return
water at or below 120 deg F, the Model CFC will achieve condensing
performance, with associated gains in efficiency.
If using only a single (common) return, the lower return connection
should be used.
4. Pressure drop curves
The information in
Figure 2-25
through
Figure 2-35
and in Tables
2-12
and
2-13
can help in determining pump requirements for
Model CFC installations.
Figure 2-24 Pressure Relief
Valve Piped to Safe Point of
Discharge
!
Warning
Only properly certified personnel such as the safety valve
manufacturer’s certified representative should adjust or repair the
boiler safety valve.
Failure to follow this warning could result in
serious personal injury or death.
Содержание CFC-1000
Страница 1: ...Manual Part No 750 263 07 2010 Model CFC ClearFire Condensing Boiler Operation Service and Parts ...
Страница 35: ...Section 2 Installation Part No 750 263 2 21 Figure 2 23 Gas Piping ...
Страница 47: ...Section 2 Installation Part No 750 263 2 33 Figure 2 41 Electrical Connection Diagram ...
Страница 49: ...Section 2 Installation Part No 750 263 2 35 Figure 2 43 CFC Wiring Diagram dual fuel units ...
Страница 50: ...Section 2 Installation 2 36 Part No 750 263 ...
Страница 70: ...Section 3 Stack and Intake Vent Sizing and Installation 3 20 Part No 750 263 ...
Страница 102: ...Section 4 CFC Commissioning 4 32 Part No 750 263 ...
Страница 108: ...Section 5 Service and Maintenance 5 6 Part No 750 263 ...
Страница 110: ...Section 6 Parts 6 2 Part No 750 263 Figure 6 1 Boiler Mechanical Assembly I 26 15 20 20 3 10 11 G H ...
Страница 113: ...Section 6 Parts Part No 750 263 6 5 Figure 6 3 Casing Table 6 5 Casing parts ...
Страница 114: ...Section 6 Parts 6 6 Part No 750 263 Figure 6 4 Gas train single fuel Table 6 6 Gas train single fuel parts BOILER SIZE ...
Страница 117: ...Section 6 Parts Part No 750 263 6 9 Figure 6 7 Electrical assemblies single fuel ...
Страница 123: ...APPENDIX A CB FALCON CONTROLLER ...
Страница 124: ......
Страница 244: ...CB FALCON 750 265 120 ...
Страница 245: ...APPENDIX B CB FALCON PLUG IN MODULE ...
Страница 246: ......
Страница 250: ......
Страница 251: ...APPENDIX C GAS VALVE ...
Страница 252: ......
Страница 261: ...V4730C V8730C V4734C 1 1 Gas Air Servo Regulated Gas Valves EN2R 9074 0612R1 NE 9 Fig 8 V4734 VMU 500 680 ...
Страница 269: ...APPENDIX D CB FALCON MODBUS COMMUNICATION ...
Страница 270: ......