CB FALCON
79
750-265
OnLeave
A slave in the OnLeave state remains that way until
the ProcessSlaveStatus moves it to some other state.
Disabled
A slave in the Disabled state remains that way until
the ProcessSlaveStatus moves it to Recovering.
Demand and Priority
Fig. 30. LL Master demand sources.
CH DEMAND
WARM WEATHER SHUTDOWN (WW-SD)
LL MASTER DEMAND SOURCES
CENTRAL HEAT
LL CH DEMAND SWITCH
FROST PROTECTION
WARM WEATHER SHUTDOWN
LL WARM WEATHER SHUTDOWN ENABLE
LL WARM WEATHER SHUTDOWN SETPOINT
LL MASTER FROST PROTECT ENABLE
DISABLE LL CH
STAT
EnviraCOM REMOTE STAT
MASTER
HEAT DEMANDS
THE SOURCES ASKING
FOR HEAT. USED FOR
PUMP CONTROL.
MASTER
ACTIVE SERVICE
THE DEMAND SOURCE
THAT IS CURRENTLY
CONTROLLING THE LL
MASTER.
Table 37. CH Demand Parameters.
Parameter
Comment
LL CH demand switch
Disable, STAT, EnviraCOM Remote Stat
The inputs that can function as the CH demand switch are: STAT, EnvironCOM Remote Stat.
If the CH demand switch value is Disable, the LL master does not respond to CH demand.
Table 38. Warm Weather Shutdown (WW-SD) Parameters.
Parameter
Comment
Warm weather shutdown enable
Disable, Shutdown after demands have ended, Shutdown immediately
Содержание CFC-1000
Страница 1: ...Manual Part No 750 263 07 2010 Model CFC ClearFire Condensing Boiler Operation Service and Parts ...
Страница 35: ...Section 2 Installation Part No 750 263 2 21 Figure 2 23 Gas Piping ...
Страница 47: ...Section 2 Installation Part No 750 263 2 33 Figure 2 41 Electrical Connection Diagram ...
Страница 49: ...Section 2 Installation Part No 750 263 2 35 Figure 2 43 CFC Wiring Diagram dual fuel units ...
Страница 50: ...Section 2 Installation 2 36 Part No 750 263 ...
Страница 70: ...Section 3 Stack and Intake Vent Sizing and Installation 3 20 Part No 750 263 ...
Страница 102: ...Section 4 CFC Commissioning 4 32 Part No 750 263 ...
Страница 108: ...Section 5 Service and Maintenance 5 6 Part No 750 263 ...
Страница 110: ...Section 6 Parts 6 2 Part No 750 263 Figure 6 1 Boiler Mechanical Assembly I 26 15 20 20 3 10 11 G H ...
Страница 113: ...Section 6 Parts Part No 750 263 6 5 Figure 6 3 Casing Table 6 5 Casing parts ...
Страница 114: ...Section 6 Parts 6 6 Part No 750 263 Figure 6 4 Gas train single fuel Table 6 6 Gas train single fuel parts BOILER SIZE ...
Страница 117: ...Section 6 Parts Part No 750 263 6 9 Figure 6 7 Electrical assemblies single fuel ...
Страница 123: ...APPENDIX A CB FALCON CONTROLLER ...
Страница 124: ......
Страница 244: ...CB FALCON 750 265 120 ...
Страница 245: ...APPENDIX B CB FALCON PLUG IN MODULE ...
Страница 246: ......
Страница 250: ......
Страница 251: ...APPENDIX C GAS VALVE ...
Страница 252: ......
Страница 261: ...V4730C V8730C V4734C 1 1 Gas Air Servo Regulated Gas Valves EN2R 9074 0612R1 NE 9 Fig 8 V4734 VMU 500 680 ...
Страница 269: ...APPENDIX D CB FALCON MODBUS COMMUNICATION ...
Страница 270: ......