background image

CLEARSPAN

 FABRIC STRUCTURES

10

Revision date: 09.08.09

38

'W

 x

 1

6'

-1

 3

/4

"H

 x

 1

04

'L

F1-1.0

CONNECTION - DETAIL

3/17/2009

C

L1

08

54

7

D

C

B

A

A

B

C

D

1

2

3

4

5

6

7

8

8

7

5

6

4

3

2

1

D

ra

w

B

y

C

re

at

io

D

at

e

Manger Approval

La

st

 R

ev

is

io

D

at

e

38

' x

 1

04

' E

co

no

m

B

ui

ld

in

g

S

he

lte

r S

ku

 N

um

be

r

Shelter Dimensions

Shelter Descriptio

n

Design Approval

Engineering Approval

Jaw-Jaw Turnbuckle

Cable Thimble

Cable Clamps

Cable Clamps

Cable Thimble

View 1

Side Wall Cable Assembly

View 2

Conduit-Tek Screw Connection

Typical cable-to-frame connection.

Customer-Supplied Baseboard

Содержание CL108547

Страница 1: ...A B D E F G H Title Front Profile Side Profile Connection Call Out Connection Details Rafter Pipe Details 3 17 2009 Cover and End Panel Details N A Width Center Center Sidewall Height Rafter Spacing Length Center Center Rafter Tubing Cover Conduit Tubing Height Ground Peak Purlin Tubing of Runs Cover Info End Wall Door End Wall Tubing End Panel Info 38 W x 16 1 3 4 H x 104 L N A N A 1 66 Round 12 ...

Страница 2: ...s an important step before you begin to assemble the structure Always consult local and regional building codes before you begin The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure under power lines Identify whether underground cables and pipes are present before preparing the site or anchoring the structur...

Страница 3: ...ons before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of connected pipes to form a conduit Each pipe joint of a conduit assembly is secured with a self tapping Tek screw Coupler or Fitting A part of the frame assembly where legs purlins and rafter pipes are inserted and secu...

Страница 4: ...do not need to open the plastic bags containing the fasteners if used SHELTER CARE AND MAINTENANCE Proper care and maintenance of your shelter is important Check the following items periodically to properly maintain your shelter Inspect the shelter and all components frequently and regularly Regularly check the main cover and panels if equipped to see that these remain tight and in proper repair C...

Страница 5: ...t can be used to ensure an accurate 90 angle or the 3 4 5 rule can be used Refer to diagram Using multiples of 3 4 5 such as 6 8 10 or 12 16 20 helps to maintain an accurate 90 angle After squaring the position of the building and placing a stake at all corners 3 string a line between the stakes to mark the base of the building Next mark a line on the ground using the strings between the stakes as...

Страница 6: ...R40P3D Ground Level FRONT PROFILE B1 1 0 Last Revision Date D C B A A B C D 1 2 3 4 5 6 7 8 8 7 5 6 4 3 2 1 Engineering Approval Manger Approval Design Approval Shelter Description Shelter Dimensions 38 x 104 Economy Building Drawn By Creation Date Shelter Sku Number CL108547 QH1061 Ratchet Attach to End Rafters only QH1061 Ratchet Attach to End Rafters only ...

Страница 7: ...F1 1 0 View 1 Rafter Spacing Center to Center 8 0 104 0 Length Last Revision Date D C B A A B C D 1 2 3 4 5 6 7 8 8 7 5 6 4 3 2 1 Drawn By Creation Date Engineering Approval 38 x 104 Economy Building Shelter Sku Number Shelter Dimensions Shelter Description Design Approval Manger Approval CL108547 1 66 Cover Conduit Pipe Assembly 1 166P096 12 166S099 Purlin Tek Screw Connection F1 1 0 View 2 Secur...

Страница 8: ...er Description Shelter Dimensions Shelter Sku Number Last Revision Date Creation Date Design Approval CL108547 CONNECTIONS D1 1 0 38 W x 16 1 3 4 H x 104 L 3 17 2009 E1 1 0 View 1 Connection End Rafter Purlin E1 1 0 View 2 Connection Rafter Foot Mid Rafter Purlin Connection E1 1 0 View 3 QH1061 ratchet attached to end of end rafter QH1065 ratchet attached to side of same rafter ...

Страница 9: ...urlin Connection Bracket Rafter Coupler See Detail Below Mid Rafter 105350 Purlin Connection Bracket 3 8 x 1 Bolt 3 8 Nut 108539 1 2 x 5 1 2 Bolt 1 2 Nut 1 2 x 4 1 2 Bolt 1 2 Nut QH1065 Ratchet 108539 CONNECTION DETAILS View 1 End Rafter Purlin Connection View 2 Rafter Foot Connection 3 17 2009 View 3 Mid Rafter Purlin Connection Rafter Foot Connection Rafter Coupler See Detail Below Rafter 108807...

Страница 10: ...n By Creation Date Manger Approval Last Revision Date 38 x 104 Economy Building Shelter Sku Number Shelter Dimensions Shelter Description Design Approval Engineering Approval Jaw Jaw Turnbuckle Cable Thimble Cable Clamps Cable Clamps Cable Thimble View 1 Side Wall Cable Assembly View 2 Conduit Tek Screw Connection Typical cable to frame connection Customer Supplied Baseboard ...

Страница 11: ...6 8 1 2 PRE BEND 4 00 10 GA DIA GA 38R40P1D 9 16 DRILL N A DEGREE N A BEND LCTN 6 7 3 8 PT TO PT Plain TYPE 6 8 1 2 PRE BEND 4 00 10 GA DIA GA 38R40P2D 38R40P3D DIA GA 4 00 10 GA PRE BEND 6 8 1 2 TYPE Plain PT TO PT 6 7 1 2 BEND LCTN N A DEGREE N A DRILL 9 16 Last Revision Date D C B A A B C D 1 2 3 4 5 6 7 8 8 7 5 6 4 3 2 Manger Approval Drawn By Creation Date 1 38 x 104 Economy Building Shelter ...

Страница 12: ... 6 1 1 8 3 17 2009 H1 1 0 MAIN COVER DETAILS 38 W x 16 1 3 4 H x 104 L CL108547 D C B A A B C D 1 2 3 4 5 6 7 8 8 7 5 6 4 3 2 1 Drawn By Creation Date Manger Approval Last Revision Date 38 x 104 Economy Building Shelter Description Shelter Dimensions Shelter Sku Number Design Approval Engineering Approval Over The Top Measurement 54 4 652 ...

Страница 13: ...eded to assemble a the cover conduit Insert the swaged end of each pipe into the b plain end of another pipe until the conduit is assembled See Side Profile diagram Secure each pipe joint with a Tek screw c Use duct tape to tape over each Tek screw d Locate the main cover and unfold it on a clean smooth surface near the frame Unfold the main cover with the inside surface facing up and the straps 2...

Страница 14: ... has not been properly secured Locate the black straps at the front and rear hems and feed the straps 5 through the center slot in each end ratchet QH1061 Operate the ratchet to wrap the strap onto the center hub just enough to keep the strap secure NOTE Use lifts and additional assistants if needed to help pull the cover up and over the frame Shelter shown above may be a different style or length...

Страница 15: ...n cover was pulled in place a slit in the cover pocket may already be present NOTE Do not tighten completely at this time Frame and ratchet location differ from actual frame Steps to install the main cover are similar however Feed one end through the slot in the cover pocket and around the conduit 3 Feed both ends of the strap through the slot in the ratchet and slightly 4 tighten the ratchet Repe...

Страница 16: ...it and feed it into the stretch pocket from 1 the bottom at one end of the cover Insert the plain end of the conduit into the pocket so the next section can be joined to the first Photo shows a similar cover and the location of the stretch pocket Cover is shown with the underside facing up which is the side visible from inside the frame when the cover is installed For some covers the notched porti...

Страница 17: ...d take one end of the bulk roll of 1 strapping and weave it around the end rafter and PVC conduit Continue weaving the strap around the end rafter and PVC conduit working 8 up and over the rafter and down to the other end of the PVC conduit NOTE Keep the strapping snug during this step but do not over tighten Also maintain a even distance between the end rafter and the PVC conduit Photo shows how ...

Страница 18: ... the strap The strapping will 12 pull against the strapping installed at the other end of the frame TIGHTEN THE SIDE RATCHETS Verify that the cover is in the desired position and centered on the frame Loosen and reposition if needed Continue with these steps to tighten the side ratchets Move to the side ratchets attached to each leg of one rafter Begin at an 1 inside rafter near the center of the ...

Страница 19: ...19 CLEARSPAN FABRIC STRUCTURES Revision date 09 08 09 This page is reserved for customer notes ...

Отзывы: