23
CLEARSPAN
™
POLY BUILDINGS
Revision date: 05.20.20
10
Attach QH1065 ratchets to the
inside
of the header along the awning side of the frame. These ratchets
to for the upper conduit secure the main cover on the awing side of the building.
Attach one ratchet per
rafter. Use the diagram below as a guide.
1. On the awning side of the frame
on the inside face
of the header, attach one ratchet for each rafter.
Use one FAJ117B (5/16" x 3") lag bolt for each ratchet. Set each ratchet a few inches to the right or
left of the rafter.
2. Continue by attaching the roll-up curtain.
ATTACH RATCHETS (continued)
QH1065
RATCHETS
FAJ117B Lag
Screw
Header