CLEARSPAN
™
COMMERCIAL CANOPIES
4
Revision date: 06.22.10
REQUIRED TOOLS
The following list identifies the main tools needed to
assemble the shelter. Additional tools and supports may be
needed depending on the structure, location, and
application.
Tape measure or measuring device
•
Variable speed drill and impact driver (cordless with
•
extra batteries works best)
Wrenches or ratchet and socket set (recommended)
•
Two ropes long enough to reach over the shelter (The
•
use of rope depends on the height of the shelter. Other
main cover installation methods may not use rope.)
Hammers, gloves, and eye protection
•
Duct tape (supplied by customer)
•
Box cutter or utility knife
•
Ladders, work platforms, and other machinery for lifting
•
designed to work safely at the height of the shelter
UNPACK AND IDENTIFY PARTS
The following steps will ensure that you have all the
necessary parts before you begin to assemble the shelter.
Unpack the contents of the shipment and place where
1.
you can easily inventory the parts. Refer to the Bill of
Materials/Spec Sheets.
Verify that all parts listed on the Bill of Materials/Spec
2.
Sheets are present. If anything is missing or you have
questions, consult the Pictorial Parts Guide and all
shelter diagrams for clarification, or contact Customer
Service.
NOTE:
At this time, you do not need to open the plastic
bags containing smaller parts such as fasteners or
washers.
QUICK START GUIDE
For an overview of this shelter and to see the main
connection details, consult the diagrams in the Quick Start
Guide located at the back of these instructions.
ALTERNATIVE ASSEMBLY INFORMATION
These instructions describe assembling the entire roof
section of the shelter first. The frame is then lifted and the
legs added. For long shelters or when limited assistance
is available, constructing the frame and legs in sections
suitable for lifting and moving and working from one end to
the other is an alternative assembly method. (This method
is not shown.)
To assembly the frame in sections, read these instructions
first and adapt the steps as needed. Consult all diagrams
and the Quick Start section of this manual to better
understand how the frame is assembled before you begin.
Install the main cover as a single unit after the frame is
assembled and anchored.