CLEARSPAN
™
POLY BUILDINGS
14
Revision Date: 03.13.08
Carriage Bolt
Top, Center
Purlin
View is from inside
the shelter.
View is from
inside the
shelter.
103856
QH1070
ATTENTION:
Install a
carriage bolt in this location
at both ends of the shelter.
Consult the Side Profile
diagram in the Quick Start
section.
Drill through the rafter and
purlin to install the bolt.
Apply duct tape over
cables on end rafters
to protect the main
cover.
CABLE PLACEMENT
The diagram and inserts below identify the placement and
proper way to attach the cable assemblies to the building.
Do not tighten the cables until the frame is properly and
securely anchored to the site as described in the Must
Read document.
NOTE:
The positions of the cable assemblies are identical for the opposite
side and the remaining end of the building that are not shown.
Consult the
Side Profile Diagram in the Quick Start section for rafter spacing and cable
locations
.
Top, Center
Purlin
Attach the band clamp (103856) above the lowest
pipe strap (QH1070) on the end rafters only. Once
the cable is attached and the clamp is tightened,
secure the clamp to the rafter using a Tek screw.
Carriage bolt runs through rafter
and top center purlin on the 5th
rafter at each end.