![ClearSpan 104900 Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/clearspan/104900/104900_manual_2621742004.webp)
CLEARSPAN
™
CEDAR GREENHOUSES
4
Revision date: 06.18.09
The following graphics and photos will help you identify the
different parts of the building. (Some parts are not shown.)
FAS8 & FAS13
Construction Screws
FAF25P
Phillips Head Screws
104639
Pass-thru Connector
104636
Corner Bracket
LAY OUT THE BUILDING SITE
After the site is prepared, identifying the location of the
greenhouse corners helps to square the frame after it is
assembled.
Taking these steps
before
assembling the greenhouse
saves time and ensures that the structure is positioned as
desired. The following procedure is a suggested method.
Its use depends on the size of the greenhouse, the
footings, and the method used to anchor the shelter.
SQUARE THE SITE
Identify a corner where a building rafter will be
1.
positioned, drive in a stake, and string a line the exact
width of the building and stake in place.
String a line at least as long as the building from the
2.
first stake at 90°.
NOTE:
A transit can be used to ensure an accurate 90°
angle, or the 3-4-5 rule can be used. Refer to diagram.
Using multiples of 3-4-5 such as 6-8-10 or 12-16-20
helps to maintain an accurate 90° angle.
After squaring the position of the building and placing
3.
a stake at all corners, string a line between the stakes
to mark the base of the building.
104643
Middle Connector
104642
A-Angle