9
CLEARSPAN
™
JUBILEE TENTS
Revision date: 07.01.08
FRAME ASSEMBLY (CONTINUED)
ATTENTION
: Once the holes of the rafters and the
couplers have been aligned and secured with a carriage
bolt and nut, secure each rafter pipe connection with a Tek
screw. Make sure the head of the Tek screw is drilled in a
position where it will not contact the main cover.
ATTENTION:
The following steps will require
assistance. Heavy lifting is involved. Height
assistance may also be required. If needed, use
ladders or steady platforms to safely elevate the frame.
Gather the eight (8) sections of #190P094D pipe, as
4.
they will serve as the legs
.
Starting with a corner, carefully hoist the roof section
5.
of the frame high enough to slide a leg, holes first, into
the corner coupler. Align the holes and secure with a
carriage bolt and nut. Repeat this process at the other
three corners, and then add legs to the four sides.
Connect the side rafters as shown in diagram below.
2.
Secure each connection with a carriage bolt and nut.
Actual frame may differ from frame shown.
Connect the base rafters as shown in the following
3.
diagram. Secure each connection with a carriage bolt
and nut.
Side Rafter
Side Rafter
Side Rafter
Side Rafter
Side Coupler
TOP VIEW
TOP VIEW
Base Rafter
Base Rafter
Base Rafter
Base Rafter
Base Rafter
Base Rafter
Base Rafter
Base Rafter