ClearFox CU-M Скачать руководство пользователя страница 5

ClearFox®Control Unit CU-M

5

 

W

ARNINGS 

/

 OPENING OF THE CASING

 

To gain access to the screw-type terminals, the service compartment of the casing must be 
opened by unscrewing the two cross slot screws marked with the red circles in 

Figure 1

 

Figure 1

: Opening the casing of the Sequetrol® IoT midi 

This kind of operation may only be carried out by trained staff, since there are live 
components carrying 230V mains voltage under the cover (at the underside of the printed 
circuit board and close to the mains supply connectors and the fuse, mains voltage 230 V.) 

Before removing the casing cover, it is necessary to pull the mains supply connector! 

6

 

C

ONNECTING THE CONSUMERS 

(

BLOWER

,

 HOSES

,

 BEACON

6.1

 

A

IR

-SBR 

-

Blower

: Connected to the electric socket of the 

ClearFox®Control Unit CU-M

.

-

Valves

:

o

Filling: Out 2

o

Clearwater removal / Discharge: Out 3 

 either valve or submersible pump (can

be selected via the web pages)

o

Sludge return: Out 4

o

Aeration / Denitrification: Out 5

-

BonFlash

 alarm beacon

 is connected to the terminals marked with 

BF-C

 (brown cable)

and 

GND

 (white cable), (see chapter 5).

Содержание CU-M

Страница 1: ...1 Quick Start Guide ClearFox Control Unit CU M...

Страница 2: ...ed Bed 6 6 5 Drippling filter D Tropfk rper 6 7 Connecting to Wi Fi 7 7 1 Connecting the control unit to the internet via Wi Fi ST mode 7 8 Alarm handling 8 9 Process overviews 8 9 1 Air SBR 8 9 1 1 P...

Страница 3: ...ClearFox Control Unit CU M 3 12 2 Transfer via USB 16...

Страница 4: ...where you d type www google com http 192 168 117 1 o Username for service login service o Password 1111 same as service menu PIN 3 INTRODUCTION The ClearFox Control Unit CU M platform is a powerful fr...

Страница 5: ...t the underside of the printed circuit board and close to the mains supply connectors and the fuse mains voltage 230 V Before removing the casing cover it is necessary to pull the mains supply connect...

Страница 6: ...jection Aerator Connected to the electric socket of the ClearFox Control Unit CU M Out 5 electric socket Sludge return Pump Out 3 Valve Out 3 Blower BonFlash alarm beacon is connected to the terminals...

Страница 7: ...not forget to push Apply Wi Fi Settings control unit restarts The ClearFox Control Unit CU M can run Wi Fi in Access Point AP and in Station Mode ST AP Wi Fi hotspot without internet connection intra...

Страница 8: ...deactivates the Buzzer and the BonFlash output The red LED remains on and the last alarm remains in the Status Screen until the reason for the alarm is gone e g float switch is down again or until th...

Страница 9: ...Eco mode o Aeration o Level measurement via Filling If above switching level 1 normal o Each 6 eco cycles frequency can be changed At least one normal mode 9 1 2 Water level measurement Water level m...

Страница 10: ...re as it cannot suck anymore water 3 Sludge return for some 60s to increase the level in the pretreatment so that the filling airlift can pump properly again 4 Filling for 20s the pressure at this min...

Страница 11: ...over DI1 open Eco Via Sludge Pump ON 10s OFF 14 50min or until DI1 closed On timeout step time over DI1 open Eco o Denitrification 0 40min ON 9 20min OFF 60min Total o Aeration 8min ON 12min OFF 9 5h...

Страница 12: ...ssure limits 7 350mbar for Blower applied Pump Out 3 Current limits 300 1800mA for pump applied 9 3 ONE TANK SBR 9 3 1 Process steps For the level measurement overfill alarm a manual calibration must...

Страница 13: ...ease ask PPU in case you want to activate it Time taken from the settling time example Settling 2h sludge 2min settling will be 1 58h in reality and sludge 2min sludge return after settling can be dea...

Страница 14: ...ower applied Via sludge pump Out 3 Current limits for pump 300 1800mA applied CLEARWATER Blower valve Out 1 2 Current limits for Blower 250 900mA valve 50 150mA applied Generic pressure limits 7 350mb...

Страница 15: ...mA valve 50 150mA applied Generic pressure limits 7 350mbar for Blower applied Via sludge pump Out 4 Current limits for pump 300 1800mA applied CLEARWATER ON DAY OFF DAY ON NIGHT OFF NIGHT ON HOLIDAY...

Страница 16: ...here click on Start update process done 12 2 TRANSFER VIA USB Please mind that the batteries must be connected Please record the pkg Pack file into the root folder of a common USB stick formatted wit...

Отзывы: