
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
4
FieldSmart 96-Port PON FDH Cabinet
Installation Manual
_________________________________________________________
Manual 022684 REV A - Jan 2022
Mounting the Enclosure
1.
Install the hoist plate to the top of the cabinet using the provided hardware.
2.
Locate the toothed bracket and mount it to the cabinet using the included
hardware.
3.
Determine the top height of the cabinet. Drill a 5/8” hole 9 inches below the anticipated height of the cabinet, all the way
through the pole.
Note:
Clearfield does not provide the mounting hardware. Required hardware
includes a 5/8” threaded rod (3” longer than pole diameter), washers, lock
washers, nuts and Lock Tight (red).
4.
Mount the loose toothed bracket to
the pole using threaded rod, wash
-
ers, and nuts on either side of the
pole. Rod length will depend on the
diameter of the pole. It is suggested
to add 3” to the diameter of pole for
rod length.