![Clean Energy CE-340 Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/clean-energy/ce-340/ce-340_owners-manual_2620001011.webp)
11
Figure 8: Typical Boiler Installation
Refer to Figure 8 for a typical boiler installation illustration.
Installation of your boiler will include the following steps:
(1) Selecting a location
(6) Installing the metering pump and oil lines
(2) Mounting the boiler in position
(7) Connecting the compressed air line
(3) Connecting the electrical supply
(8) Installing the wall thermostat
(4) Installing the chimney components
(9) Design and Installation of hydronics system
(5) Positioning the oil storage tank
(10) Inspecting the boiler installation
BOILER INSTALLATION
8
FT.
MA
X
IMUM
L
IFT
DEDICATED ELECTRIC SERVICE
OIL PUMP ELECTRICAL CIRCUIT
COMPRESSED
SUCTION
OIL LINE
10 FT.
3 F
T
.
8" MIN
RELIEF
RETURN
CE70086
PRESSURE
OIL LINE
OIL STORAGE
TANK
AIR LINE
(M
IN
.)
OIL PRESSURE LINE
5 FT.
MINIMUM
Содержание CE-340
Страница 2: ...7 3 13 Part 70006 Underwriters Laboratories File MH48829 ...
Страница 35: ...BOILER DIMENSIONS 35 57 5 42 5 67 with Burner 34 0 CE70077 50 ...
Страница 40: ...40 1 4 12 6 15 9 10 14 3 2 11 5 13 8 7 Nozzle Adapter Heater Block Assembly ...
Страница 42: ...42 2 5 7 6 4 5 3 12 11 9 8 10 1 CE70058 CE 4 Manifold Block Assembly ...
Страница 44: ...44 26 14 9 23 2 8 7 6 12 20 13 21 19 18 17 16 15 1 5 3 4 10 22 25 11 24 CE70050 Metering Pump Assembly ...
Страница 46: ...46 CE 340 Boiler 25 27 26 28 24 21 22 23 20 14 13 12 11 10 9 8 7 6 5 4 1 2 3 15 16 17 18 CE70101 19 ALT ALT ...