PE 6001

DOUBLE SCISSOR LIFT 3T

ANCHOR PLUG INSTALLATION:

The anchor plugs installation must be carried out simultaneously whit the installation of the lift, 

this is to  ensure the stability of the structure and a perfect seal:

Leveling: 

Lift loading test: 

Picture 21

Picture 22

Adjust the base parallelism and the distance between the two platforms.
Fasten the anchor plugs with a percussion electric drill, poke a 120 mm hole and clean it 

before inserting the dowels. (Picture21)
Use a rubber hammer to insert the dowels into the floor.

Use a level to adjust the leveling of the bases.
If the irregularity of the platforms is due to the irregularity of the bases, use an iron thickness 

to level it.
After adjusting the level, insert the anchor and use a hammer to secure it.

Switch one the machine with the «MAIN SWITCH» power button.
Press the “UP” button, and pay attention to the synchronization and to the lifting fluidity.
Check that there is no leakage of oil.3

The gap between the base plate and the ground after the adjustment has to be filled with 

an iron or concrete plate. 

During the test of the lift, no person, object and or material must be located near the two sides 

and below the lift. If an anomaly occurs, press the “EMERGENCY STOP” button to stop the lift 

immediately.  After removing the obstacles repeat the test. 

Содержание PE 6001

Страница 1: ...clas com DOUBLE SCISSOR LIFT 3T PE 6001...

Страница 2: ...tions for use breakdown manufacturing problem please contact us Contact You can reach us by mail sav clas com or by phone 33 0 4 79 72 69 18 or go directly to our website clas com If you have changed...

Страница 3: ...any other expense not specified in the supply contract are at the purchaser s charge The replacement and repair of parts under warranty anyway do not extend warranty terms The purchaser will neverthel...

Страница 4: ...ded If finding missing parts possible defects or damages to the goods caused during the transport you should immediately inform the person in charge or the carrier The lifter is really heavy Don t mov...

Страница 5: ...fting transport unpacking assembly installation starting up initial adjustment and testing extraordinary maintenance repair overhauls transport and dismantling of the lift are all operations that must...

Страница 6: ...on doors Scissor lift is designed and built to lift all kinds of vehicles all other use are unauthorized In particular the lift is not suitable for washing spray work And do not lift vehicles whose we...

Страница 7: ...Hydraulic oil Working temperature Working humidity Noise level Installation height Storage temperature Installation place PE 6001 Electrical hydraulic Hydraulic 3500kg 1950mm 105mm 1420mm 650mm 50s 6...

Страница 8: ...PE 6001 DOUBLE SCISSOR LIFT 3T Lift dimension picture Picture 3...

Страница 9: ...PE 6001 DOUBLE SCISSOR LIFT 3T Lift groundwork drawing for in ground installation Picture 4...

Страница 10: ...f the lift platform nr P1 and nr P2 represents the concrete structure When the thickness of the inside level ground is less than 150mm the end of P1 and P2 should be taken to 2500 2500mm length and th...

Страница 11: ...orms for personnel or lifting personnel Use as a press for crushing purposes Use as elevator Use as elevator for single parts of vehicles The manufacturer is not liable for any injury to persons or da...

Страница 12: ...s that operators or maintenance fitters may be exposed to when the vehicle is standing on the platforms in its raised position together with the various safety and protection devices adopted by the ma...

Страница 13: ...ght of the lifted vehicle or in the case the vehicle dimensions are not compatible with the capacity of the lift When the platform is being tested the vehicle engine cannot be turned on There is nothi...

Страница 14: ...s it is perfectly leveled and sufficiently resistant 250 kg cm the thickness of concrete 150 mm All parts of the lift must be uniformly illuminated with enough light to make sure that the adjustment a...

Страница 15: ...oil pipes be careful not to mistake the oil pipe Open the front cover on the control box Connection of power supply The three phase connection cables with 5 poles 400V 5 x 2 5 mm cable dimension are...

Страница 16: ...te the MAIN SWITCH button to turn on the power by clicking the UP button proceed checking that the engine rotates clockwise by looking down if it s not turn off the MAIN SWITCH and then change the mot...

Страница 17: ...leveling of the bases If the irregularity of the platforms is due to the irregularity of the bases use an iron thickness to level it After adjusting the level insert the anchor and use a hammer to se...

Страница 18: ...o stop the process immediately Resolve the problem and repeat the test again Before any operation remove possible obstacles from the lifting area of the lift When lifting or lowering the platforms no...

Страница 19: ...form press the EMERGENCY STOP button to stop the entire operating circuit and to interrupt any other operations HYDRAULIC OIL ADJUSTMENT normal conditions of use EMERGENCY PROCEDURE FOR PLATFORM MANUA...

Страница 20: ...ower outlet The AC contactor does not work The limit switch is not closed The motor turns reverse Lifting with light load works normally but not with heavy load The hydraulic oil has a high viscosity...

Страница 21: ...PE 6001 DOUBLE SCISSOR LIFT 3T Air circuit diagram only for mechanical lock version APPENDIX...

Страница 22: ...PE 6001 DOUBLE SCISSOR LIFT 3T Hydraulic hose connection diagram APPENDIX...

Страница 23: ...PE 6001 DOUBLE SCISSOR LIFT 3T Hydraulic diagram for the hydraulic lock version APPENDIX...

Страница 24: ...PE 6001 DOUBLE SCISSOR LIFT 3T Electrical diagram 230V for the hydraulic lock version APPENDIX...

Страница 25: ...PE 6001 DOUBLE SCISSOR LIFT 3T Electrical diagram 400V for the hydraulic lock version APPENDIX...

Страница 26: ...ntactor thermal relay motor fuse power supply computer board power lamp emergency UP button DOWN button SEC DOWN button synchronization button photoelectric shield key switch buzzer descent valve work...

Страница 27: ...PE 6001 DOUBLE SCISSOR LIFT 3T...

Страница 28: ......

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ...parts please contact the reseller In case of problems please contact your authorized technician CLAS Equipements ZA de la CROUZA 73800 CHIGNIN FRANCE T l 33 0 4 79 72 62 22 Fax 33 0 4 79 72 52 86 PE 6...

Отзывы: