6
Parts & Service: 020 8988 7400 / E-mail: [email protected] or [email protected]
5. Unfasten the protective hose cap
(not shown here) and screw the
hose onto the connector block.
•
We recommend sealing the
thread with PTFE tape. Take
care not to let any oil escape
while connecting the hose.
6. Fit the pressure gauge to the
union nut on the inside of the
frame. Check the gauge face is
upright before tightening the union nut.
7. The air bleed tube is connected
to the ram at one end. Connect
the free end to the pump, using
an open wrench and sealing the
thread with PTFE tape (not
supplied).
•
The winch is supplied
disconnected from the frame
but connected to the lifting
cable ready for use. The
handle will be pointing
towards the middle of the packing crate during transit.
8. Fit the winch as shown with the
handle facing away from the
press before securing it to the
frame with the mounting bracket,
nuts, bolts and washers.
9. Bolt the protective screen
brackets to the pressing bedplate.
Содержание STRONG-ARM CSA50FP
Страница 20: ......