![Clarke Devil 1250(ss) Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/clarke/devil-1250-ss/devil-1250-ss_operating-and-maintenance-manual_2614850007.webp)
7
CHANGING GAS BOTTLES
1. Turn off the heater and disconnect from the electrical supply.
2. Close the gas valve on the bottle and unscrew the regulator,
(left hand
thread)
.
3. Ensure the replacement bottle screw threads and gas orifice is perfectly
clean before screwing in the regulator valve tightly.
4. Check to ensure there are no leaks using soapy water and when satisfied,
plug in to the electrical supply and restart the heater.
MINIMUM FRESH AIR OPENING REQUIREMENTS
Heater Model
Output
Minimum
Minimum
Btu/hr
Ventilation in
2
Ventilation cm
2
Little Devil
35,000
35
226
Devil 650/660
52,000
52
335
Devil 850/860
107,000
107
690
Devil 1250/1260
149,000
149
961
Devil 1850
200,000
200
1290
Devil 3000
281,000
281
1812
Devil 3150
344,000
344
2219
e.g. For the Devil 1250 at max. output, a 3ft window must be open by 3.5"
minimum.
As a general rule of thumb, an opening of 1in
2
per 1000 Btu/hr is a minimum
requirement.
Содержание Devil 1250(ss)
Страница 14: ...14 PARTS DIAGRAM LITTLE DEVIL SS...
Страница 16: ...16 PARTS DIAGRAM DEVIL 650 660...
Страница 18: ...18 PARTS DIAGRAM DEVIL 850 860...
Страница 20: ...20 PARTS DIAGRAM DEVIL 1250 1260...
Страница 22: ...22 PARTS DIAGRAM DEVIL 1850...
Страница 24: ...24 PARTS DIAGRAM DEVIL 3000...
Страница 26: ...26 PARTS DIAGRAM DEVIL 3150...
Страница 28: ......