![Clarke 7140635 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/clarke/7140635/7140635_operating-and-maintenance-instructions_2616074011.webp)
11
6. Once the engine starts, gradually return the choke to the left (RUN)
position as the engine warms up, and use the engine throttle to gradually
increase engine speed.
7. After starting the engine, move the throttle to the LEFT (open) position
during priming of the pump and checking for pump output which is
controlled by adjusting the engine speed.
NOTE: Filling the suction pipe with water will speed up the priming
process, and it is recommended that a non-return valve be fitted
to the end of the suction pipe.
On high vertical lifts, a higher engine speed is necessary but on shallow lifts or
when there is little water to pump, preserve fuel and engine wear by
reducing engine speed.
In the event of blockages, where debris has entered the suction chamber,
the suction chamber can be opened and cleaned out by removing the
suction chamber bolts shown in Fig 2 (page 7).
When the machine is new, it should only be run at low speed and subject to a
reduced load for the first 20 hours of normal running. Do not run the pump flat
out until the machine has been run in and the oil replaced for the first time as
itemised under MAINTENANCE.
Properly fuelled and lubricated, your pump will run without attention.
SHUTTING DOWN
1. Gradually reduce engine speed to minimum using the throttle lever.
2. Stop the engine by switching the ON/OFF switch to OFF.
3. In an emergency, simply move the ON/OFF switch to the OFF position.
Содержание 7140635
Страница 1: ...OPERATING MAINTENANCE INSTRUCTIONS GC0410 PETROL DRIVEN WATER PUMP Model CU150 Part No 7140635...
Страница 7: ...7 1 2 3 4 5 Fig 1 7 6 8 9 10 11 12 13 14 15 16 17 Fig 2...
Страница 21: ...21...
Страница 23: ...23...
Страница 25: ...25 PARTS DIAGRAM PUMP...
Страница 26: ...26 DECLARATION OF CONFORMITY...
Страница 27: ...27 DECLARATION OF CONFORMITY...
Страница 28: ......