8
Parts & Service: 020 8988 7400 / E-mail: [email protected] or [email protected]
BEFORE USE
OIL GAUGE/OIL TOP UP
This machine has an oil chamber built in. The machine can be used for
approximately 20 days without resupplying the lubrication oil, assuming that
the hammer is used continuously for 3-4 hours daily. Check the oil level before
every use.
Check oil level by standing the
machine upright and view the oil
level through the gauge window. If
low;
1. Place hammer on a flat surface
with the oil gauge window facing
upwards.
2. Using the wrench, remove the oil
gauge window cover.
3. Top up the oil well using the oil
bottle supplied. No more than 25ml at a time.
• DO NOT overfill the chamber.
4. Replace the oil gauge window cover and tighten with wrench before
using the hammer again.
POSITIONING THE AUXILIARY HANDLE
The front handle can be positioned
left, right or centre as required.
1. Loosen the handle adjustment
knob by twisting it clockwise.
2. Rotate the handle to the required
position.
3. Secure the handle by twisting the
handle adjustment knob
anticlockwise.
INSERTING A HAMMER BIT / CHISEL
The chuck clamps SDS 30mm Hex hammer bits and chisels without the need
for a chuck key.
Содержание 6479509
Страница 16: ......