background image

Hydro 4

Hydro 4

Page 3

USE. It is possible to set up two watering programmes, A and B, which operate independently from each other 

on one or more of the 4 lines                                       .

Each watering Programme, A or B, can be set to start watering on any day of the week (WEEKLY SCHEDULE), up 

to 4 times a day (START TIME) and for a maximum run time of 60 minutes for each line (RUN TIME).

1

2

3

4

Hydro 4 (cod.):  90829

Hydro 4 (cod.):  90829

PROGRAMMING EXAMPLE. In the example, programme A starts watering at 5:00 (START TIME) and at 21:00 

(START TIME2): at these times the valves open in order (RUN TIME: valve 1 for 5 minutes, valve 2 for 10 minutes, 

valve 3 for 5 minutes, valve 4 not used). The programme starts on Mondays, Wednesdays, Fridays (WEEKLY 

SCHEDULE). 

Programme B starts watering at 6:00 (START TIME): at this time only valve 4 opens for 20 minutes (RUN TIME). 

The programme only starts on Saturdays (WEEKLY SCHEDULE).

User manual

User manual

3

Line 

4

Line 

2

Line 

Income

1

Line 

Start  time 1

run time (min)

run time (min)

run time (min)

1

ore 5:00

1

Start  time 2

2

3

4

Start  time 1

1

ore 21:00

Start time 3

5 10 5 OFF

2

3 4

5 10 5

Watering programme A

Start time 4

OFF

OFF

3

4

Start time 3

Start time 4

OFF

2

Start time 2

OFF

OFF

ore 6:00

Watering programme B

OFF OFF

20

1

2

3

4

1

2

3 4

OFF

Sunday

Monday

A

A

A

B

S

M

T

W

T

F

S

OFF

W

eek

ly schedule 

(w

at

ering da

ys)

Run time  (w

at

ering

amoun

t)

Star

t time 

(w

at

ering time)

Tuesday

Wednesday

Thursday

Friday

Saturday

Содержание Hydro 4

Страница 1: ...make the hydraulic connections as indicated on the following pages depending on individual requirements it is possible to connect the valve box with pipes of different diameters using the specific fi...

Страница 2: ...5 Take out the water time 6 Unscrew the battery compartment plug 7 take out the battery holder 8 and if present remove the drained batteries Fit the new batteries in the holder observing the correct p...

Страница 3: ...s valve 3 for 5 minutes valve 4 not used The programme starts on Mondays Wednesdays Fridays WEEKLY SCHEDULE Programme B starts watering at 6 00 START TIME at this time only valve 4 opens for 20 minute...

Страница 4: ...Start Time prog A Run Time prog B Start Time prog B Weekly Schedule Rain Sensor Manual Test PROG EXIT LINE B A B A B A B A B A B A B A B A S M T W T F S LOW BATT OK ERR 1 2 3 4 14 15 Indicate the prog...

Страница 5: ...xit from the changes by pressing the key OK will appear on the lower right part of the display It is now possible to go back to the page with the and keys and change the values if needed SETTING CURRE...

Страница 6: ...ble modification the symbol flashes indicating that the parame ters displayed can be modified and require a setting confirmation Using changes the value displayed by pressing and holding the keys the...

Страница 7: ...ng cycles are activated From the WEEKLY SCHEDULE page press the symbol flashes Sunday Each time is pressed the screen displays which programme is to start on that day only A only B both A and B neithe...

Страница 8: ...display PROGRAMMINGWATERING Exiting the test manual watering page Move to the page whereTEST is displa yed with the symbols and flashing Press to exit TEST manual mode Press to go back to the page wi...

Страница 9: ...which programme is to be enabled The possible selections are 4 If programmes A and B are assigned on the same day this could cause the simultaneous opening of the two lines the system does not have a...

Страница 10: ...tions Do not use abrasive pads scourers or acid detergents n winter or long periods of inactivity close the tap or the gate valve upstream access the control module and manually open all 4 lines in se...

Отзывы: