![CKD FGRC Series Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/ckd/fgrc-series/fgrc-series_instruction-manual_2611709020.webp)
SM-A14448-A/2
4. MAINTENANCE AND INSPECTION
15
2019-08-19
4. MAINTENANCE AND INSPECTION
WARNING
Install the product before wiring.
An electric shock may occur.
Do not work with wet hands.
An electric shock may occur.
Before performing wiring and inspection, wait five minutes or longer after turning off the
power and check the voltage with a tester.
An electric shock may occur.
Do not attach or remove wires and connectors with the power turned on.
A malfunction, failure, or electric shock may occur.
Do not disassemble or modify the product.
An injury, accident, malfunction, or failure may occur.
CAUTION
Wiring and inspections must be performed by specialists.
For the lead wires used for the power cable, use wires with a sufficient diameter that can
allow the instantaneous maximum current to flow.
A heat generation or damage may occur during operation.
Perform periodic inspections (two to three times a year) to confirm that the product operates
properly.
When operations where the table is turned less than 45 deg are performed repeatedly, make
sure to turn the table by more than 90 deg (as a rough reference, at least once a day).
The bearing may run out of grease.
Turn off the power immediately if abnormal heat, smoke, odor, sound, or vibration occurs in
the product.
The product may become damaged or the continuous flow of currents may cause a fire.
Stop supplying power to the product before performing maintenance, inspection, and repair.
Take measures to prevent a third person from turning on the power unexpectedly.