background image

18

4

B

A

Linking 2 programs

It is possible to run 2 programs automatically in sequence. This can be handy
to perform very special functions (like waterproofing outerwear) and add these
to the wash program.

Programming:

First select the program

 which will be run last.

Now, press the START-button (S) and 

keep it depressed for at least 5 seconds

.

The left display now shows “

Add

”. Now select the program which

 will be run

first

.

The right display now shows both linked programs 

alternately

: the first to be

run program during the longer time span alternating with the following program
displayed during the shorter time span.
This function is canceled by pressing the START-button (S) again for at least

5 seconds

.

This function 

can be combined

 with an economy wash, with the functions F1

to F6 and with a programmed start. The 

freely programmable stop-function

 can

however only be executed during the first program.

Operation:

Press the START-button (S) to start the programs. The central display will show
the remaining time

 per program

. The total time of both programs together is 

not

displayed

.

The right display 

alternately shows

 the program in operation (during a longer

time span) and the second program to be executed (during the shorter time span).
After the first program has been run, only the second program number will be
displayed.

Cool down

This function allows to gradually lower the temperature of the wash bath to
prevent creasing of the linen.
During a cool down, the remaining program time on the central display will be
replaced by “

cd

”.

Power Failure

Should the power fall out during the program, the water will be drained and the
door can be opened after maximum 3 minutes.  When the door remains locked,
and the power comes back up within 24 hours, the program will continue from
there, where it was at the time of the power failure.

If due to breakdown, the door is not unlocked automatically, you have to remove
the service panel (A) below and pull the ring (B), suspended on the left side, while
opening the door.

Before opening the door, check that all the water has been drained from the
tub and that the cylinder has come to a complete stop.

Important:

Remote stop function

By means of this function, 

no cycles can be selected anymore during a certain

period of time 

(e.g. between 10 p.m. and 7 a.m.).  This time is determined by an

extern timer

.  As soon as the last cycle is finished,

 OFF

 “ (blinking) appears on the left display as long as this function is activated.

Содержание IPSO HF304

Страница 1: ......

Страница 2: ...brackets 6 Waterconnection 6 Waterdrain 7 Mainpowerconnection 7 Automatic lubricator 8 Liquid soap connection 9 Steam connection 10 4 Operatinginstructions 11 Machine with start button 11 5 Standardpr...

Страница 3: ...water inlets steam and electrical supplies at the end of each operating day Before starting repairs or maintenance shut off all power and water supplies To prevent fire and explosion Keep the area aro...

Страница 4: ...nnection Heating Electric 220 380 V Electric 380 V Steam Boilerfed Boiler fed with auxiliary heating Packing dimensions H x W x D Weight Net Gross Technical data and dimensions Technical data HF 245 H...

Страница 5: ...ions S A Hard water connection 3 4 B Warm water connection 3 4 C Soft water connection 3 4 D Electricalconnection E Electricalconnectionclamps F Output steam valve G Water drain H Steam connection I V...

Страница 6: ...h see Dimensions 2 Themachinemustbeplacedentirelylevel Foreasymaintenanceitisrecommen ded to keep a minimal distance of 600 mm between the wall and the back of the machine If several machines are plac...

Страница 7: ...in has not been sufficiently deodorized every machine should be installed seperately with a deodorizer S S S Water drain Removethecoverplateatthebackofthemachine Seedimensions E Connect the power cabl...

Страница 8: ...tomatically lubricates the bearing during one year Upon delivery of the machine this lubricator has not been brought into use To this effect please put on the matching screw B in the foreseen opening...

Страница 9: ...n provided of which one S6 can be used to drive a waterproofing pump e g for rain coats etc The 220V can be transformed to other values to drive other type soap pumps Example pumps24V Also pumps with...

Страница 10: ...3 8 7 Steam hose with appropriate pipe coupling 3 8 The manufacturer is not responsible for damage or accidents caused by not following the installation instructions Addedpartsforsteamheatingwithheat...

Страница 11: ...tton the programmer can contain up to 100 programs 0 99 The program number is displayed on the right display By pressing the SELECT button P the next program will be displayed By pressing the ECO butt...

Страница 12: ...when the power has been cut from the machine for more than 24 hours The right display will continue to show the selected program number IfaLevel stopwasprogrammed whichhaltstheprogrammerduringthefilli...

Страница 13: ...3 Reduced wash action To avoid wear of delicate garments F4 Execute high spin as low spin To avoid creasing delicate linen F5 Rapid advance To skip certain program segments F6 No spin To give total pr...

Страница 14: ...eECObutton E Bypressing it once the stop time is programmed for 10 minutes From now onwards F1 and 10 appear by turns on the middle display By pressing the ECO button E once more you add each time 10...

Страница 15: ...tion eliminates all spin action Intermediatespinisreplacedbyaregularwashaction Duringfinalspin onlythe programmed low spin time will be completed as regular wash action High spin is skipped in its ent...

Страница 16: ...edthesafetylevel thedoorwillremainsealedandthedisplaywillshow SLE SafetyLevel ontheleftdisplay Afterwardsthedisplaywilltemporarily show End on the same display and the Start LED will be switched off A...

Страница 17: ...e time will be stopped The wash bath will be filled to the appropriate level and temperature and the programmed wash action is executed The left display will alternately showtemperature and StO while...

Страница 18: ...s the program in operation during a longer timespan andthesecondprogramtobeexecuted duringtheshortertimespan After the first program has been run only the second program number will be displayed Coold...

Страница 19: ...frequently used detergents Program 0 starching is mostly used in very special applications and is therefore not displayed on the front panel 0 Starching 1RINSE COLD 1 HOTWASH 2BATHS 40 90 C 2 HOTWASH...

Страница 20: ...ed Remark Other executions are available as options The tilt switch is mounted on the solid part of the machine There is a window around the probe of the tilt switch that is mounted on the movable par...

Страница 21: ...wrongpriceadjustmentforthisprogram Acoinvalue 0 or bigger than 1000 was programmed Example wrongpriceadjustmentforprogram5 E4 waterlevel The appropriate water level was not reached after 15 minutes E5...

Страница 22: ...ogram the central display will communicatetheappropriateerrormessageattheendofthecycle When this malfunction has been removed and a new program has been selected this error message also disappears Whe...

Страница 23: ...few months and will brake shortly afterwards Checkregularlyifthefiltersofthewaterinletarenotblockedbycalcification Ifamachinefrequentlyskipsthefinalspin checkwhethertheprobeoftheout of balance switch...

Отзывы: