Page 10
General Installation (All Dryers)
Position dryer for the least amount of exhaust piping and elbows,
and allow free access to the rear of dryer for future servicing of belts,
pulleys and motors. Installation clearance from all combustable
material for gas dryers is 0” ceiling clearance, 24” rear clearance, and
0” side clearance. Installation clearance from all combustable material
for steam dryers is 0” ceiling clearance, 24” rear clearance, and 0” side
clearance.
Before operating dryer, open basket door and remove blocking
between front panel and basket. Read the instruction tags, owner's
manual, warnings, etc.
The dryer is so designed that when an operator opens the dryer
door, the basket and exhaust fan stop. Hot, dry air is properly and
effectively moved through the basket and exhausted through a lint trap
to the venting and eventually to the atmosphere. The lint accumulates
in the collector and should be removed as needed, minimum once daily.
IMPORTANT
Provide adequate clearance for air openings into the
combustion chamber.
Replacement parts for this dryer are available from your distribu-
tor or by contacting the factory at the address or phone number printed
on the cover of this manual.
WARNING Unit is heavy!
NOTE
The gas installation must conform with local codes or, in
the absence of local codes, with the National Fuel Gas Code,
ANSI Z223.1 or the CAN/CGA-B149, Installation Codes.
GENERAL
INSTALLATION
(ALL DRYERS)
GENERAL
IMPORTANT
REPLACEMENT
PARTS
Содержание HD75ST
Страница 11: ...Page 11 75 lb STACK DRYER Outline Dimensions...
Страница 20: ...Page 20 Exhaust Installation Multiple Manifold Duct Illustration...
Страница 38: ...Page 38 Illustration Front View of Dryer...
Страница 40: ...Page 40 Illustration Rear View of Dryer...