C H A P T E R
2
Installing the GPU Module
This chapter contains the following topics:
•
Installing and Removing the GPU Module, on page 5
•
Front Mezzanine GPU Module Configuration, on page 10
Installing and Removing the GPU Module
The front mezzanine module installs into the front mezzanine slot of Cisco UCS X-Series compute nodes.
•
•
Removing the Front Mezzanine GPU Module, on page 6
•
Installing the Front Mezzanine GPU Module, on page 8
Required Equipment
Cisco provides a kit (UCSX-X10C-GPUFM) for installing the Cisco UCS X10c front mezzanine GPU module.
The kit contains the following:
• Required GPU cables
• The front mezzanine cage including:
• The storage cage which supports a maximum of two U.2 drives
• The GPU cage which supports a maximum of two Cisco T4 GPUs (UCSX-GPU-T4-MEZZ).
If you order the Cisco UCS X10c front mezzanine GPU module with one GPU,
the unused GPU slot is pre-populated with a filler module. You can purchase
additional filler modules from Cisco
Note
To provide flexibility for your deployment, the U.2 drives and GPUs are orderable separately. However, if
you order the Cisco UCS X10c front mezzanine GPU module with one GPU, the unused GPU slot is
pre-populated with a filler module. You can purchase additional filler modules from Cisco.
Cisco UCS X10c Front Mezzanine GPU Module Installation and Service Guide
5