
Cisco UCS C210 M2 General-Purpose Rack-Mount Server
34
CONFIGURING the SERVER
STEP 13
ORDER OPTIONAL CABLE MANAGEMENT ARM
The cable management arm hooks onto the right and left slide rails at the rear of the server and
is used for cable management. You can order the cable management arm listed in
Table 16
.
For more information about the cable management arm, see the
Cisco UCS C210 Installation and
Service Guide
at this URL:
http://www.cisco.com/en/US/docs/unified_computing/ucs/c/hw/C210M1/install/C210M1.html
Table 16
Cable Management Arm
Product ID (PID)
PID Description
R2XX-CMAG3-1032
Cable Mgmt Arm for R2XX-G31032RAIL for C200/C210