4-17
Cisco uBR7225VXR Universal Broadband Router Hardware Installation Guide
OL-17309-01
Chapter 4 Connecting the Cisco uBR7225VXR Router to the Cable Headend
Measuring the Downstream RF Signal
Figure 4-21
Measuring the RF Signal at the Upconverter Output in CATV Mode—Digital Channel
Power Screen Using Video Averaging
Note
The approximate in-channel peak-to-valley flatness can be verified using the spectrum analyzer’s video
averaging feature. Be aware, however, that amplitude values registered while in the video averaging
mode are typically around 2.5 dB below the actual channel power.
Step 11
Verify that your headend RF measurements meet the recommended DOCSIS parameters listed in the
tables in
Appendix B, “RF Specifications.”
Step 12
Record your headend settings and measurements in
Appendix G, “Site Log.”
as you verify them. This
will assist in troubleshooting the Cisco uBR7225VXR router installation later in the process.
Step 13
After you have analyzed and adjusted the RF signal according to the steps outlined on the preceding
pages, proceed to the
“Connecting and Configuring the Upstream” section on page 4-18
.
Содержание UBR7225VXR
Страница 8: ...Contents viii Cisco uBR7225VXR Universal Broadband Router Hardware Installation Guide OL 17309 01 ...
Страница 16: ...xvi Cisco uBR7225VXR Universal Broadband Router Hardware Installation Guide OL 17309 01 Preface ...
Страница 18: ...xviii Cisco uBR7225VXR Universal Broadband Router Hardware Installation Guide OL 17309 01 Preface ...
Страница 188: ...Index IN 8 Cisco uBR7225VXR Universal Broadband Router Hardware Installation Guide OL 17309 01 ...