4-9
Cisco uBR7225VXR Universal Broadband Router Hardware Installation Guide
OL-17309-01
Chapter 4 Connecting the Cisco uBR7225VXR Router to the Cable Headend
Measuring the Downstream RF Signal
Figure 4-8
Measuring the RF Signal at the Upconverter Output—Overload Condition Corrected
with Attenuation
Step 7
Change the spectrum analyzer settings to view the digital channel power. This setting enables you to see
if there is too much power on the upconverter output. In
Figure 4-9
, the upconverter output is reading
+64.31 dBmV, which is beyond the DOCSIS-specified range of +50 to +61 dBmV.
Tip
A spectrum analyzer might become overloaded and produce false readings (such as internally generated
spurs) when measuring a signal at this amplitude.
Figure 4-9
Measuring the RF Signal at the Upconverter Output—Upconverter Output Level Too
High
Step 8
Adjust the power on the upconverter output to ensure that it is b50 and +61 dBmV. In
Figure 4-10
, the upconverter output is r57.06 dBmV, which is within the correct range.
Содержание UBR7225VXR
Страница 8: ...Contents viii Cisco uBR7225VXR Universal Broadband Router Hardware Installation Guide OL 17309 01 ...
Страница 16: ...xvi Cisco uBR7225VXR Universal Broadband Router Hardware Installation Guide OL 17309 01 Preface ...
Страница 18: ...xviii Cisco uBR7225VXR Universal Broadband Router Hardware Installation Guide OL 17309 01 Preface ...
Страница 188: ...Index IN 8 Cisco uBR7225VXR Universal Broadband Router Hardware Installation Guide OL 17309 01 ...