Cisco SCE 2000 4/8xFE Installation and Configuration Guide
OL-7826-05
iii
Replacing the Battery 4-22
Connecting the Management Interfaces and Performing Initial System
Configuration 5-1
Connecting the Local Console 5-1
Setting Up the Local Console 5-2
Initial System Configuration 5-3
Setup Command Parameters 5-3
Step 1: Configuring Initial Settings 5-6
Step 2: Configuring the Hostname 5-7
Step 3: Setting the Passwords 5-7
Step 4: Configuring Time Settings 5-8
Step 5: Configuring the DNS Settings 5-10
Step 6: Configuring the RDR Formatter Destination 5-11
Step 7: Configuring Access Control Lists (ACLs) 5-12
Step 8: Configuring SNMP 5-16
Step 9: Configuring the Topology-Dependent Parameters 5-19
Step 10: Completing and Saving the Configuration 5-23
Connecting the Management Interface 5-25
Cabling the Management Port 5-26
Verifying Management Interface Connectivity 5-26
Cabling the Line Ports and Completing the Installation 6-1
Connecting the line ports to the network 6-1
Cabling Diagrams 6-2
Connecting the FE Line Interface Ports 6-6
Testing Connectivity: Examining Link LEDs and Counters 6-7
Installing a Cascaded System 6-9
CLI Commands for Cascaded Systems 6-10
Loading and Activating a Service Control Application 6-13
Basic SCE 2000 Platform Operations 7-1
Starting the SCE 2000 Platform 7-1
Checking Conditions Prior to System Startup 7-1
Starting the System and Observing Initial Conditions 7-2
Final Tests 7-3