background image

Cisco Systems, Inc.

www.cisco.com

Cisco has more than 200 offices worldwide. 
Addresses, phone numbers, and fax numbers 
are listed on the Cisco website at 
www.cisco.com/go/offices.

Cisco Network Convergence System 
6000 Series Routers
Unpacking, Moving, and Securing Guide

September 2013

Text Part Number: OL-29233-01

Содержание NCS 6008

Страница 1: ...200 offices worldwide Addresses phone numbers and fax numbers are listed on the Cisco website at www cisco com go offices Cisco Network Convergence System 6000 Series Routers Unpacking Moving and Securing Guide September 2013 Text Part Number OL 29233 01 ...

Страница 2: ...rence by using one or more of the following measures Reorient or relocate the receiving antenna Increase the separation between the equipment and receiver Connect the equipment into an outlet on a circuit different from that to which the receiver is connected Consult the dealer or an experienced radio TV technician for help Modifications to this product not authorized by Cisco could void the FCC a...

Страница 3: ...ischarge 1 3 Site Preparation 1 3 System Installation Templates 1 3 Dolly Specifications 1 4 Unpacking the Dolly 1 5 Required Tools and Equipment 1 5 Steps 1 5 Modifying the Dolly Configuration 1 11 Required Tools and Equipment 1 11 Steps 1 11 C H A P T E R 2 Required Tools and Equipment 2 1 Steps 2 2 Attaching the Dolly to the Chassis and Removing the Chassis Pallet 2 5 Prerequisites 2 6 Required...

Страница 4: ...gence System 6000 Series Routers Unpacking Moving and Securing Guide OL 29233 01 C H A P T E R 4 Prerequisites 4 1 Required Tools and Equipment 4 1 Steps 4 2 Unpacking Chassis Components 4 3 Steps 4 3 Component Return Information 4 4 ...

Страница 5: ...wledge of routing or the Cisco IOS XR software is assumed Conventions This document uses the following conventions Convention Indication bold font Commands and keywords and user entered text appear in bold font italic font Document titles new or emphasized terms and arguments for which you supply values are in italic font Elements in square brackets are optional x y z Required alternative keywords...

Страница 6: ...amage or loss of data Timesaver Means the described action saves time You can save time by performing the action described in the paragraph Warning IMPORTANT SAFETY INSTRUCTIONS This warning symbol means danger You are in a situation that could cause bodily injury Before you work on any equipment be aware of the hazards involved with electrical circuitry and be familiar with standard practices for...

Страница 7: ...Planning Guide Cisco Network Convergence System 6000 Series Routers Hardware Installation Guide Regulatory Compliance and Safety Information for the Cisco Network Convergence System 6000 Series Routers Changes to This Document Table 1 lists the technical changes made to this document since it was first created Table 1 Changes to This Document Revision Date Change Summary OL 29233 01 September 2013...

Страница 8: ...t and gathering additional information see the monthly What s New in Cisco Product Documentation which also lists all new and revised Cisco technical documentation http www cisco com en US docs general whatsnew whatsnew html Subscribe to the What s New in Cisco Product Documentation as a Really Simple Syndication RSS feed and set content to be delivered directly to your desktop using a reader appl...

Страница 9: ... the number of options that you ordered the Cisco NCS 6008 chassis arrives packaged in several shipping crates and pallets The chassis is shipped on a pallet by itself and arrives inside a polyethylene bag enclosed in a plywood box held in place by steel clips Other system components are shipped in separate crates and can arrive at the final chassis site at different times For complete details on ...

Страница 10: ...afety Guidelines Caution Before you perform any procedure in this document review the safety guidelines in this section to avoid injuring yourself or damaging the equipment The following guidelines are for your safety and to protect equipment Guidelines do not include all hazards Be alert Note Review the safety warnings listed in Regulatory Compliance and Safety Information for the Cisco NCS Netwo...

Страница 11: ...sis Handle a card by its ejector levers when applicable or its metal carrier only avoid touching the board or connector pins Place a removed card board side up on an antistatic surface or in a static shielding bag If you plan to return the component to the factory immediately place it in a static shielding bag Avoid contact between the card and clothing The wrist strap protects the board from only...

Страница 12: ...lexible enough to meet several challenges common when first positioning a chassis of this size and weight Such challenges include limited hallway or doorway width doorway thresholds ramps and tight corners along the transport route To overcome these challenges use the dolly in either of the following configurations 90 degree configuration The dolly assemblies are shipped in this configuration In s...

Страница 13: ...n the 90 degree configuration Figure 1 3 This section describes how to unpack and position the dolly units Note In the event that the dolly supplied by Cisco is not the appropriate method of transportation consult with Cisco support to determine a method of transportation appropriate for the site Ensure that the alternate moving device is capable of supporting the weight of the chassis moving the ...

Страница 14: ... crate Swing open and lift off Step 4 Using the 3 8 inch ratchet wrench with 5 8 inch socket remove the two holding bolts from each side at the base of the dolly pallet Figure 1 2 Step 5 With at least two people one on each side of the dolly shipping crate tilt the crate back and lift off the pallet Figure 1 3 1 Side panel to be removed 3 Location of shipping pallet holding bolts two bolts on each...

Страница 15: ...s Unpacking Moving and Securing Guide OL 29233 01 Chapter 1 Dolly Specifications Figure 1 3 Removing Chassis Dolly Shipping Container Step 6 Using the 3 8 inch ratchet wrench with 5 8 inch socket remove the two bolts and the dolly stopper Figure 1 4 209079 ...

Страница 16: ...lly Shipping Stopper One Dolly Unit Step 7 Release the caster brakes and remove the dolly from the pallet Caution Each dolly unit weighs approximately 126 lb 57 kg We recommend that at least two people remove the dolly from the pallet 1 Each dolly stopper has two holding bolts Note that Figure 1 4 shows only one dolly unit The other has been removed 1 1 209080 ...

Страница 17: ...iguration with labels to components Figure 1 5 Chassis Dolly 90 Degree Configuration 1 Dolly handle label 6 Caster anti rotation pins 2 Swing component for dolly used to change the dolly configuration 7 Label showing how to attach dolly to chassis 3 Lift bracket bolts 8 Move height calibration label 4 Lift brackets 9 Lifting cranks 5 Brakes 138974 8 7 3 4 2 3 3 1 9 9 6 6 4 5 5 ...

Страница 18: ...guration Both dolly units are identical Figure 1 6 Chassis Dolly 180 Degree Configuration 1 Dolly handle label 6 Brakes 2 Lifting cranks 7 Caster anti rotation pins 3 Swing component for dolly used to change the dolly configuration 8 Lift brackets 4 Move height calibration label 9 Label showing how to attach dolly to chassis 5 Lift bracket bolts 9 5 4 5 1 3 2 7 7 6 6 2 8 8 138975 ...

Страница 19: ...on Change the dolly configuration one caster at a time Take your time and do not rush through the process Make sure that the bolts are secured after you have completed changing the configuration Required Tools and Equipment 3 8 inch ratchet wrench 12 mm hex bit Steps To change the dolly configuration from the as shipped 90 degree configuration to the preferred 180 degree transport configuration pe...

Страница 20: ...rt the holding bolts and partially tighten the bolts Step 7 Repeat Step 1 through Step 6 for the other dolly unit Figure 1 6 shows the dolly in a 180 degree configuration Step 8 Lock the dolly caster brakes and anti rotation pins until you are ready to move the chassis Step 9 Using the 3 8 inch ratchet wrench with 12 mm hex bit firmly tighten the holding bolts on both dolly units Note To change th...

Страница 21: ...evice before all other component shipping boxes Leave all other component shipping boxes in the receiving area or in an area as space allows at your site until the chassis is secured in its final location Table 2 1 lists the physical characteristics of the chassis shipping crate Required Tools and Equipment 3 8 inch ratchet wrench 10 mm hex bit 11 16 inch socket to remove the top wood and frame cu...

Страница 22: ...p 1 Locate a large area to accommodate and remove the chassis crate Step 2 Remove the hinge mechanisms from the front door Raise and twist the lock hinges at the base of the plywood box Figure 2 1 Figure 2 1 Cisco NCS 6008 Chassis in Original Packaging 1 Lock latches 2 Large side panel 3 Three sided plywood box 101813 1 2 3 ...

Страница 23: ...e wooden enclosure and set it aside carefully Note When setting aside the box be careful to rest the wood on the floor so that the metal lock latches are not bent or otherwise damaged On most of the wooden enclosure there should be rubber bands above the bottom lock latches to hold them up so that they do not get damaged when setting the enclosure down Step 4 Disengage the remaining latches from t...

Страница 24: ...with tape Figure 2 3 Chassis Shipping Box Removed and Chassis Shipping Bag Step 7 You need a ladder or step platform to remove the four top cover bolts Figure 2 4 Use the 3 8 inch ratchet wrench with an 11 16 inch socket to loosen the four bolts holding the top wood and frame cushion system from the top of the shipping box Once the four bolts are loosened remove each bolt manually and place aside ...

Страница 25: ...l the tape that exists around the perimeter of the chassis base and pull the bag off the chassis Attaching the Dolly to the Chassis and Removing the Chassis Pallet This section describes how to attach the dolly to the Cisco NCS 6008 chassis to remove the chassis shipping pallet and prepare to move the chassis into place Only the 90 degree dolly configuration is used to remove the chassis from the ...

Страница 26: ... Dolly to the Chassis and Removing the Chassis Pallet Figure 2 5 Attaching the Dolly to the Chassis Instructions Prerequisites Before performing this task unpack both the chassis and the dolly Required Tools and Equipment 3 8 inch ratchet wrench 17 mm socket 3 4 inch socket 12 mm hex bit Dolly Cisco product ID NC 8 LIFT B 304065 ...

Страница 27: ...1 Chapter 2 Attaching the Dolly to the Chassis and Removing the Chassis Pallet Steps Step 1 Using the 3 8 inch ratchet wrench with 3 4 inch socket remove the four bolts that connect the pallet to each corner of the chassis base Figure 2 6 Figure 2 6 Remove Four Bolts That Attach Pallet to Chassis 281954 ...

Страница 28: ...ft brackets Figure 2 7 Repeat this step for the second dolly unit Figure 2 7 Remove Lift Brackets from Dolly Note The lift brackets must be attached to the chassis first Step 3 Select a lift bracket There are two identical lift brackets for the right front and left rear and two identical lift brackets for the right rear and left front Figure 2 8 1 Lift bracket 3 Two lift bracket side pins on the r...

Страница 29: ...s step with the right lift bracket on the lower right side of the front side of the chassis Figure 2 9 shows the oblique view of attaching the lift brackets to the chassis 1 From left to right left front and right front lift brackets 6 Hole for M10 x 25 mm socket head cap screw 2 Side pins on each lift bracket inserted into the chassis 7 Left front 3 From left to right Right rear and left rear lif...

Страница 30: ...t Step 4 for the rear side of the chassis Step 6 Attach the dolly to the chassis lift brackets using the M14 x 30 mm screws Figure 2 8 Step 7 If the dolly caster brakes are locked then release them and slide the dolly towards the lift brackets on the chassis Figure 2 11 so that the pins on the upper side of the unit align with the holes on the lift brackets The dolly and lift brackets must align w...

Страница 31: ...11 Sliding the Dolly to the Lift Brackets Step 8 After all bolts are secured remove the chassis pallet following these steps a Using two people one person working on each dolly unit turn the two lifting cranks to lift the chassis about 3 4 of an inch above the pallet Figure 2 12 Note One person on each side of the dolly should raise the chassis enough to cleanly remove the base pallet 149342 ...

Страница 32: ...eries Routers Unpacking Moving and Securing Guide OL 29233 01 Chapter 2 Attaching the Dolly to the Chassis and Removing the Chassis Pallet Figure 2 12 Adjusting the Height of the Dolly b Slide the pallet from under the chassis Figure 2 13 281958 ...

Страница 33: ...ter 2 Attaching the Dolly to the Chassis and Removing the Chassis Pallet Figure 2 13 Slide Pallet From Under Chassis c Using two people one person working on each dolly unit lower the chassis Figure 2 14 to within 1 inch of the floor See the height label on the dolly lift wheel assembly 281959 DO NOT TRANSPORT ...

Страница 34: ...transport route and the moving space requirements at your site the dolly can be used to move the chassis in the 90 degree or 180 degree configuration The 180 degree position is the recommended configuration for moving the chassis Warning To reduce the risk of dolly instability chassis damage or personal injury do not raise the equipment more than 1 inch 2 4 cm above the floor during transportation...

Страница 35: ...site Ensure that the alternate moving device is capable of supporting the weight of the chassis moving the chassis safely and preventing the chassis from tipping too far and falling during transport Guidelines When you use the dolly to move the as shipped Cisco NCS 6008 chassis follow these guidelines When using the dolly to move the as shipped chassis between locations ensure that the chassis is ...

Страница 36: ...y to tip so use extra care when transporting the chassis in that configuration When the dolly is used to transport the chassis to reduce the risk of dolly instability chassis damage or personal injury do not raise the equipment more than 1 inch 2 4 cm above the floor during transportation The dolly can be used to transport the chassis over thresholds up to 1 5 inches When transporting the chassis ...

Страница 37: ...r than required to remove the shipping pallet For information about maximum dolly heights see the dolly instructions in this document Statement 368 Caution Dolly wheel casters and anti rotation pins should be in the locked position when the dolly is not in use Verifying the Move Path Before moving the chassis it is critical that you verify that the path that you are planning to use to move the cha...

Страница 38: ...ation 1 Width on dolly 180 degree position 44 in 112 cm 4 Width on dolly 90 degree position 24 in 60 cm 2 Depth on dolly 180 degree position 48 in 122 cm 5 Depth on dolly 90 degree position 70 in 178 cm 3 Turn radius on dolly 180 degree position 33 in 83 cm 6 Turn radius on dolly 90 degree position 37 in 94 cm 303608 Dolly 180 degree Dolly 180 degree Cisco NCS 6008 Chassis Dolly 90 degree Dolly 90...

Страница 39: ...isle Space Requirements to Install the Cisco NCS 6008 Chassis Top View With Dolly Removed Moving the Unpacked Chassis Prerequisites Before performing this task make sure that the dolly is in the correct configuration is firmly attached to the unpacked chassis and the dolly brakes are in the locked position Note If a dolly configuration change is required see the Modifying the Dolly Configuration s...

Страница 40: ...s If needed because of site requirements rotate the dolly to the 90 degree position If you are transporting in a 90 degree configuration then have at least two people moving the chassis to prevent any transporting hazard See the Modifying the Dolly Configuration section on page 1 11 for further information Note You must lower the chassis completely to the floor before rotating the outrigger legs W...

Страница 41: ...chapter are specific to securing the chassis to a concrete floor The instructions for securing the chassis to a raised floor vary from site to site depending on such details as whether your floor needs additional support as local practice applies for raised floors and where depending on the location of the floor tiles the bolt holes need to be Work with your facilities representative to determine ...

Страница 42: ...entified locations Step 2 Remove the drill hole template and drill the indicated anchor bolt holes into the floor at the pilot hole locations Step 3 If an alternate floor mounting pattern is required remove the lower side panels left and right sides of the chassis to expose additional floor mounting holes Figure 4 1 Figure 4 1 Remove Lower Side Panels to Expose Additional Floor Mounting Holes 3042...

Страница 43: ...is frame or dolly and reduce the risk of tipping too far Step 7 Remove the dolly from the chassis Warning Do not permanently locate the equipment on the dolly Safely store the dolly after use Statement 357 Step 8 Insert all anchor bolts Step 9 Tighten all bolts and nuts Unpacking Chassis Components The remaining shipping boxes and pallets are now ready to be delivered from the receiving shipping d...

Страница 44: ...n instructions of individual components Component Return Information Before preparing to return the product or product components you must contact Cisco technical support and provide them with the details of your difficulty Cisco technical support must confirm your product or component failure before assigning an RMA number for return shipment For additional information see the Obtaining Additiona...

Отзывы: