Verification Time and Date
Planning Activity
Distance limitations for
signaling
Site wiring
RFI levels
Contact and Site Information
Use the following worksheet to record contact and site information for the installation.
Contact person
Contact phone
Contact e-mail
Building/site name
Data center location
Floor location
Address (line 1)
Address (line 2)
City
State/Provence
Contact person
ZIP/postal code
Country
Chassis and Module Information
Use the following three worksheets to record information about the chassis and modules.
Cisco Nexus 9336PQ ACI-Mode Switch Hardware Installation Guide
59
Site Preparation and Maintenance Records
Contact and Site Information