A P P E N D I X
B
Site Planning and Maintenance Records
This section includes a site planning checklist and maintenance records to use when installing the Cisco MDS
9396T Multilayer Fabric Switch.
For information about how to query the switch for configuration information, see the
Cisco NX-OS
Fundamentals Configuration Guide
.
Note
•
Site Preparation Checklist, on page 59
•
Contact and Site Information, on page 61
•
Chassis and Network Information, on page 61
Site Preparation Checklist
Planning the location and layout of your equipment rack or wiring closet is essential for successful switch
operation, ventilation, and accessibility. The following table lists the site planning tasks that we recommend
completing before installing the Cisco MDS 9396T Switch.
Consider heat dissipation when sizing the air-conditioning requirements for an installation.
Table 9: Site Planning Checklist
Date
Time
Verified By
Planning Activity
Task No.
Space evaluation:
• Space and layout
• Floor covering
• Impact and vibration
• Lighting
• Maintenance access
1
Cisco MDS 9396T Multilayer Fabric Switch Hardware Installation Guide
59