37
Power Supply Installation
Power-Supply Module Installation
Figure 22
Stripping the Ground Wire
3.
Insert the ground wire into the terminal lug, and crimp the terminal to the wire. (see
Figure 23 on page 37
).
Figure 23
Crimping the Terminal Lug
4.
Slide the ground screw from Step 1 through the terminal lug. Insert the ground screws into the opening on the cable
side.
Figure 24
Attaching the Terminal Lug
5.
Use a ratcheting torque screwdriver to tighten the ground screws to 30 in-lb (± 2 in-lb).
6.
Attach the other end of the ground wire to an appropriate ground.
Installing the Power-Supply Module in the Switch
1.
Ensure that the power is off at the AC or DC circuits.
1
Dual-hole terminal lug
Insulation
Wire lead
0.5 in. (12.7 mm) ± 0.02 in. (0.5 mm)
6052
8
2
8
093
8
Cisco IE 3010
208
33
5