2-12
Catalyst 2960-S Switch Hardware Installation Guide
OL-19732-04
Chapter 2 Switch Installation
Installing the Switch
Use four Phillips flat-head screws to attach the long side of the bracket to each side of the switch
(
).
Figure 2-12
Attaching Brackets for 19-inch Racks
1
Front-mounting position
3
Mid-mounting position
2
Number-8 Phillips flat-head screws
(48-0655-01)
4
Rear-mounting position
POWER
OVER ETHERNET 740W
11X
2X
1X
11X
14X
12X
13X
23X
24X
25X
26X
37X
39X
36X
38X
47X
48X
1
2
Catalyst 2960-S
Series
PoE+ 10G
Catalyst 2960-S
Series
PoE+ 10G
RATING
100-240
~
12-6A, 50-60Hz
11X
2X
1X
11X
14X
12X
13X
23X
24X
25X
26X
37X
39X
36X
38X
47X
48X
1
2
POWER
OVER ETHERNET 740W
Catalyst 2960-S
Series
PoE+ 10G
206599
2
1
3
4