C H A P T E R
3
Installing the Router
This chapter describes how to install the Cisco ASR 920-24SZ-IM, ASR-920-24SZ-M, ASR-920-24TZ-M
Router.
•
•
Installing the Router in a Rack, page 50
•
Wall Mounting the Routers, page 61
•
Installing and Removing the Interface Module, page 66
•
Installing and Removing the Fan Tray, page 70
•
Installing the Power Supply, page 76
•
Installing and Removing SFP Modules, page 90
•
Connecting to the 10/100/1000 Ports, page 96
•
Installing the Chassis Ground Connection, page 98
•
Connecting a Router to the Network, page 103
Prerequisites
Before installing the Cisco ASR 920-24SZ-IM, ASR-920-24SZ-M, ASR-920-24TZ-M Router, it is important
to prepare for the installation by:
•
Preparing the site (site planning) and reviewing the installation plans or method of procedures (MOP).
See
Site Planning
section.
•
Unpacking and inspecting the Cisco ASR 920-24SZ-IM, ASR-920-24SZ-M, ASR-920-24TZ-M Router.
See
Receiving the Router
section.
•
Gathering the tools and test equipment required to properly install the Cisco ASR 920-24SZ-IM,
ASR-920-24SZ-M, ASR-920-24TZ-M Router. See
Tools and Equipment
section.
For more instructions on how to prepare for the installation of the Cisco ASR 920-24SZ-IM, ASR-920-24SZ-M,
ASR-920-24TZ-M Router, see Chapter 2,
Preparing for Installation
.
Cisco ASR-920-24SZ-IM, ASR-920-24SZ-M, ASR-920-24TZ-M Aggregation Services Router Hardware Installation
Guide
49
Содержание ASR-920-24SZ-IM
Страница 2: ... Cisco Systems Inc All rights reserved ...