
Figure 105: Installing the Patch Panel - Dual in a 23-inch Rack
Step 5
Secure the brackets to the chassis with the screws. The recommended maximum torque is 28 in.-lb (3.16 N-m).
• EIA 19 and 23 inches mounting brackets for both single and double 3G interface module patch panels.
• ETSI 21 inches mounting brackets for both single and double 3G interface module patch panels.
Attaching the 3G Patch Panel Cable Management Brackets
To install the optional cable management brackets, perform these steps:
Step 1
Position the cable management brackets against the front of the chassis and align the screw holes, as shown in the figure.
Step 2
Secure the cable management brackets with the screws. The recommended maximum torque is 10 in.-lb (1.12 N-m).
Cisco ASR 903 and ASR 903U Aggregation Services Router Hardware Installation Guide
137
Installing the Cisco ASR 903 Router
Attaching the 3G Patch Panel Cable Management Brackets
Содержание ASR 903
Страница 2: ... 2015 2018 Cisco Systems Inc All rights reserved ...
Страница 10: ...Cisco ASR 903 and ASR 903U Aggregation Services Router Hardware Installation Guide x Contents ...
Страница 198: ...Cisco ASR 903 and ASR 903U Aggregation Services Router Hardware Installation Guide 188 Troubleshooting Alarm Conditions ...