Applying Power and Verifying the Installation
Applying Power to the Chassis ▀
ASR 5000 Installation Guide ▄
157
Step c
Optional. If the circuit breaker on your PFU is equipped with a locking clip, lock the circuit breaker
in place. Move the breaker’s locking clip to the left until the clip’s inside tang is recessed in the breaker’s
actuator opening.
Step d
Repeat step a through step c for the second PFU.
Содержание ASR 5000 Series
Страница 9: ...Contents ASR 5000 Installation Guide ix Spare Component Recommendations 317 ...
Страница 10: ......
Страница 14: ......
Страница 54: ......
Страница 64: ......
Страница 90: ......
Страница 104: ......
Страница 122: ......
Страница 126: ......
Страница 148: ...Cabling the Power Filter Units Power Considerations ASR 5000 Installation Guide 148 Figure 49 PFU Wiring Diagram ...
Страница 186: ......
Страница 194: ......
Страница 206: ......
Страница 228: ......
Страница 276: ......
Страница 284: ......
Страница 290: ......
Страница 300: ...RoHS Compliance Statement Chassis ASR 5000 Installation Guide 300 Chassis ...
Страница 301: ...RoHS Compliance Statement Fan Assembly ASR 5000 Installation Guide 301 Fan Assembly ...
Страница 302: ...RoHS Compliance Statement Power Filter Unit PFU ASR 5000 Installation Guide 302 Power Filter Unit PFU ...
Страница 303: ...RoHS Compliance Statement Full Product ASR 5000 Installation Guide 303 Full Product ...
Страница 304: ...RoHS Compliance Statement Full Product ASR 5000 Installation Guide 304 ...