Console
port
__
_____
oo
RING
oo
oco
oo
oo
5ial
ooo
oo
oço
plates
RING
ii
oOO
I11OVOLTSI
large
applique
plates
Figure
1-2
Router ChassisRear-Panel
View
Your
responsibilities
for bringing
the
chassis
on
line
will
include
installing
the chassis
in
rack
or
elsewhere making
external connections
to
various networks
by
way
of appropriate
interface
cables
and
using the configuration
software
routines specified in the
Router
Products
Getting Started
Guide
This publication
applies
to
hardware
installation
only
it
will
take
you
through
the
installation
up to
but not including
the configuration
software routines
1-2
AGS
Hardware
Installation
and Maintenance
Содержание AGS+
Страница 1: ...CISCO SYSTEMS ...
Страница 11: ...AGS Hardware Installation and Maintenance ...
Страница 17: ...Document Conventions xvi AGS Hardware Installation and Maintenance ...
Страница 27: ...Chassis Power Budget 1 10 AGS Hardware Installation and Maintenance ...
Страница 39: ...Chassis Components 2 12 AGS Hardware Installation and Maintenance ...
Страница 57: ...System Bootstrap Diagnostics 4 10 AGS Hardware Installation and Maintenance ...
Страница 83: ...Card Illustrations 5 26 AGS Hardware Installation and Maintenance ...
Страница 105: ...FOOl Optical Bypass Switch Pinout A 22 AGS Hardware Installation and Maintenance ...
Страница 121: ...Applique LED Indicators B lB AGS Hardware Installation and Maintenance ...
Страница 125: ...C 4 ACS Hardware Installation and Maintenance ...
Страница 127: ...Compliance Provisions D 2 AGS Hardware Installation and Maintenance ...
Страница 129: ...E 2 AGS Hardware Installation and Maintenance ...